Poland – Architectural, engineering and planning services – Opracowanie dokumentacji przedprojektowej dla budowy metra w Krakowie
Description
Name and address of the contracting authority
City of Kraków
Plac Wszystkich Świętych 3-4
31-004 Kraków
NIP 676-101-37-17
REGON 351554353
represented, on the basis of the power of attorney of the President of the City of Kraków No. 452/2026 of 1 July 2026 by:
Łukasza Szewczyk - Municipal Investment Office in Kraków
ul. Reymonta 20
30-059 Kraków
NIP: 6762530337
REGON: 367252869
1. The subject of the contract is the preparation of pre-design documentation for the construction of the metro in Kraków. The contract is implemented as part of the investment task No. SI/T1.132/26 entitled: „Metro Construction”.
2. The subject of the contract has been divided into the following stages:
1) Basic contract:
a) Stage Ia – preparation of a feasibility study with an indication of the recommended variant,
b) Stage Ib – preparation of a technical concept,
2) Contract subject to the right of option:
a) Stage II (Option I) – preparation of a detailed technical concept,
b) Stage III (Option II) – preparation of an information card of the undertaking,
c) Stage IV (Option III) – preparation of an annual natural inventory together with a report on the impact of the undertaking on the environment and obtaining a decision on environmental conditions,
d) Stage V (Option IV) – preparation of a functional-user program,
e) Stage VI (Option V) – determination of influence zones, assessment of the condition of buildings, analysis of dynamic impacts,
f) Stage VII (Option VI) – carrying out detailed geological surveys,
g) Stage VIII (Option VII) – answering contractors' questions in the procedure for awarding a public contract for the preparation of design documentation or the implementation of construction works.
3. The contracting authority may use the right of option on the terms specified in § 1, Article 14 of the Draft Contract Terms (hereinafter referred to as DCT), which is Annex No. 1 to the SWZ.
4. The contractor is obliged to perform the subject of the contract in accordance with the Subject of the Contract (SC) and its annexes, which are Annex No. 1 to the SWZ. The scope of the subject of the contract and the obligations of the Contractor have been defined not only in the DCT, but also in the SC and the Information Exchange Requirements (EIR), which are an integral part of the DCT and should be interpreted jointly.
NOTICE: In each place where a Polish Standard PN is indicated or quoted, the contracting authority allows equivalent standards, in accordance with Article 101, Article 4 of the Pzp Act.
5. In accordance with § 10 of the DCT, the contractor provides the contracting authority with a quality guarantee and warranty for the Documentation constituting the Subject of the contract in the scope of Stage Ia – VIII for a period of 60 months. The quality guarantee and warranty period runs separately for the individual Stages from the date of acceptance of the Stage.
6. CONTRACT PERFORMANCE TERM
I. The contractor is obliged to perform the subject of the contract within the following deadlines:
1) Basic contract – within 18 months from the date of signing the contract, i.e.:
a) The contractor is obliged to submit to the contracting authority a physical-financial schedule within 10 days from the date of signing the contract. This schedule should include the amount of remuneration, as mentioned in § 8, Article 1, point 1 of the DCT. The schedule will be presented to the contracting authority for acceptance. The contracting authority reserves the right to raise objections to the above schedule within 7 days from its submission by the contractor. The contractor is obliged to take into account the objections of the contracting authority and to submit a corrected physical-financial schedule within 5 days from the date of receipt of the objections from the contracting authority. In the event that the contracting authority uses the right of option, the contractor is obliged to update the physical-financial schedule within 10 days from the date of delivery to the contractor of the contracting authority's declaration of the use of the right of option
b) Stage Ia – preparation of a feasibility study, within 12 months from the date of signing the contract,
c) Stage Ib – preparation of a technical concept, within 18 months from the date of signing the contract.
2) Contract within the scope of the option – the implementation period is up to 64 months from the date of signing the contract, i.e.:
a) Stage II (Option I) – up to 12 months,
b) Stage III (Option II) – up to 4 months,
c) Stage IV (Option III) – up to 22 months,
d) Stage V (Option IV) – up to 26 months,
e) Stage VI (Option V) – up to 14 months,
f) Stage VII (Option VI) – up to 24 months,
g) Stage VIII (Option VII) – up to 12 months, and the mobilisation period, as mentioned in § 1, Article 14, point 3 of the DCT, from the date of notifying the contractor of the use of the right of option.
II. The maximum deadline for the completion of the implementation of Stages from Ia to VIII is 64 months from the date of signing the contract. The contracting authority may use the right of option within 14 to 38 months from the date of signing the contract in the scope of Stages II – VII, and in relation to Stage VIII within 51 months and 15 days.
III. Detailed information on the deadlines for the performance of the contract has been specified in § 6 of the DCT, which is Annex No. 1 to the SWZ.
7. Before the deadline for submitting offers, the contractor is obliged to deposit a bid bond in the amount of: 400 000,00 zł (in words: four hundred thousand złotys 00/100) and to maintain it continuously until the date of expiry of the offer binding period, with the exception of cases mentioned in Article 98, Article 1, points 2 and 3 and Article 2 of the Pzp Act. The requirements for the bid bond have been indicated in Section XVIII of the SWZ.
8. The description of the method of preparing the offer has been specified in Section X of the SWZ.
9. The SWZ has been placed on the website of the conducted procedure, where all information regarding this procedure can be found at the address https://zimkrakow.ezamawiajacy.pl/pn/zimkrakow/demand/notice/publicpzp/current/list?USER_MENU
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Engineering services – Opracowanie dokumentacji projektowo- kosztorysowej dla zamówienia pn.: 1) Część I - Dolnośląska Cyklostrada- Trasa Blue Velo 2) Część II - Dolnośląska Cyklostrada- Trasa Kolej na rowery
Gmina Miejska GłogówPolandEngineering servicesDeadline in 29 daysPublished on Nov 23, 2026
Poland – Engineering design services for the construction of civil engineering works – Opracowanie dokumentacji projektowej dla zadania: Rozbudowa drogi wojewódzkiej nr 434 na odcinku od DW 431 do S11
WIELKOPOLSKI ZARZĄD DRÓG WOJEWÓDZKICH W POZNANIUPolandEngineering design services for the construction of civil engineering worksDeadline in 41 daysPublished on Nov 23, 2026
Poland – Supervision of building work – Pełnienie nadzoru inwestorskiego nad realizacją robót budowlanych w ramach zadania inwestycyjnego pn. „Przebudowa w celu poprawy efektywności energetycznej budynku Urzędu Skarbowego w Tarnobrzegu przy ul. Wyspiańskiego 12"
Izba Administracji Skarbowej w RzeszowiePolandSupervision of building workConstruction management servicesConstruction supervision servicesDeadline in 8 daysPublished on Nov 23, 2026
Poland – Construction supervision services – Usługa sprawowania obowiązków inżyniera kontraktu nad przebudową budynku biurowego RDLP w Toruniu
Regionalna Dyrekcja Lasów Państwowych w ToruniuPolandConstruction supervision servicesLegal advisory and representation servicesDeadline in 42 daysPublished on Nov 23, 2026