Skip to content
Back to search

Germany – Heating, ventilation and air-conditioning installation work – Heizung MBA - MBG, Neubau Martin-Behaim-Gymnasium

WBG KOMMUNAL GmbHGermanyPublished on Sep 24, 2026
10 days left

Description

New construction Martin-Behaim-Gymnasium heating installation works MBA floor/water heat pump 200 kW: approx. 3 units buffer storage 4,000 litres: approx. 3 units high-efficiency circulation pump: approx. 26 units double pump: approx. 3 units magnetite and sludge separator: approx. 5 units line shut-off valves: approx. 168 units line regulating valves: approx. 58 units ball valves: approx. 196 units line regulating valves to differential pressure control valve: approx. 70 units differential pressure control valves: 70 units non-return flaps: approx. 34 units flange dirt separators: 20 units installation of two-way/three-way valves: approx. 40 units heat meters: approx. 25 units miscellaneous fittings: approx. 743 units stainless steel piping heating/cooling: approx. 4,112 m stainless steel fittings: approx. 3,509 units black threaded pipe heating: approx. 131 m black seamless pipe heating: approx. 315 m fittings heating: approx. 1,473 units mounting rails: approx. 2,195 m pipe clamps heating: 4,568 units black threaded pipe cooling: approx. 75 m black seamless pipe cooling: approx. 332 m fittings cooling: approx. 558 units pipe clamps cooling: approx. 631 units floor heating: approx. 10,465 m² distributors: approx. 70 units distribution cabinet: 39 units

CPV codes

Heating, ventilation and air-conditioning installation workBuilding installation workPlumbing and sanitary worksBoiler installation work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders