Skip to content
Back to search

Germany – Architectural, construction, engineering and inspection services – Planung der Radschnellverbindung FRM9 Seligenstadt-Frankfurt am Main (Flughafen) 4. Realisierungsabschnitt Neu Isenburg

Regionalverband FrankfurtRheinMainGermanyPublished on Feb 23, 2026
No deadline given

Description

A cycle expressway to the standard of a cycle direct connection (RDV) according to the quality standards of the State of Hesse is to be planned. The total length of the 4th realisation section (4.RA_NI) to be planned is 5 km according to the preferred route from the MBS. The 4.RA_NI will be divided into three planning sections.

CPV codes

Architectural, construction, engineering and inspection servicesArchitectural, engineering and surveying services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders