France – Ventilation and air-conditioning installation work – IC ENLS-08 - PAC 4 CANTONS ET MURISSERIE
Description
This contract concerns the replacement of 2 current gas boilers with a hybrid solution of Heat Pumps + gas boiler at the 4 Cantons metro site and a heat pump to complement the current gas boiler at the Murisserie tram site. The services of this contract include, in particular: - All precautions to avoid potential damage to public roads, nuisances, and pollution, - Studies and surveys, - Assistance to KEOLIS LILLE ILÉVIA in its procedures with the State services, - Supply of heat pump systems and their storage, - Scheduling of works, - Preparation of works, - Site installations, - Presence of personnel and equipment for the execution of works on site, - Preliminary works, - Electrical supplies from the origin of the installations, - Civil engineering works, - Metal frames for the protection of installations, - As well as any suggestions necessary for the proper functioning and sustainability of the installations. The services are detailed in the Statement of Requirements.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – District-heating mains construction work – Accord cadre à bons de commande - RÉALISATION D'ANTENNES DE RACCORDEMENT RCU - NICE EST
DALKIA MEDITERRANEE ou toute société de projet constituée par Dalkia MéditerranéeFranceDistrict-heating mains construction workNo deadline givenPublished on Oct 07, 2026
France – Building construction work – Travaux de réhabilitation de la résidence Le Clos Meunier Le Pradet 158 logements
OPH Var HabitatFranceBuilding construction workThermal insulation workJoinery workDeadline in 35 daysPublished on Oct 07, 2026
France – Engineering works and construction works – Accord-cadre de travaux de réparation d’ouvrages d’art, murs, tunnels et ouvrages de traversées hydrauliques sur l’ensemble du réseau autoroutier ESCOTA
ESCOTA SOCIETE DES AUTOROUTES ESTEREL, COTE D'AZUR, PROVENCE, ALPESFranceEngineering works and construction worksDeadline in 36 daysPublished on Oct 07, 2026
France – Supporting walls – Les travaux de restauration du mur de soutènement sud des jardins de l'EHPAD Saint-Séverin à Château-Landon
Ehpad Saint SeverinFranceSupporting wallsDeadline in 29 daysPublished on Oct 07, 2026