Poland – Electric buses – Przedmiotem zamówienia są „Zakup nowego taboru zeroemisyjnego wraz z infrastrukturą do ładowania dla PKM Spółka z o.o. w Jaworznie"
Description
6.1.1. Successive deliveries of 10 new factory electric city buses, low-floor, with a total length ranging from 11.5 m to 12.5 m, hereinafter referred to as “EV12 buses”. 6.1.2. Successive deliveries of 10 new factory electric city buses, low-floor, with a total length ranging from 17.5 m to 18.75 m, hereinafter referred to as “EV18 buses”. 6.1.3. Successive deliveries, including installation, connection and first start-up of 8 new factory charging stations Plug-in with a power greater than or equal to 180 kW, hereinafter referred to as “chargers”. 6.1.4. Warranty and post-warranty service for EV12, EV18 buses and chargers as well as training. 6.2. Common Procurement Vocabulary (CPV): Main Code: 1)34144910-0 electric buses, Additional Codes: 2)34121400-5 low-floor buses, 3)34144910-0 electric buses, 4)34121100-2 public transport buses, 5)31158000-8 chargers. 6.3. The formal requirements that the tendered subject of the contract must meet, as well as the detailed requirements, technical parameters, equipment and warranty and service conditions that the tendered subject of the contract must meet and have, are contained in: 1)Annex. No. 2.1 to SWZ – concerning EV12 buses, 2)Annex. No. 2.2 to SWZ – concerning EV18 buses, 3)Annex. No. 3 to SWZ – concerning chargers. 4)Requirements regarding ICT-cybersecurity acc. to SWZ. The contract has not been divided into lots. Dividing the contract separately for EV12 and EV18 buses and the delivery of chargers, from the perspective of the Contracting Authority, would be ineffective in economic and organisational terms. In the case of direct cooperation between the bus manufacturer and the charger manufacturer, the compatibility and full cooperation of the bus and charger devices will be ensured, and at the same time, the effect will be the correct supervision of the implementation of the delivery of chargers, assembly work, so as to ensure the timeliness and time synchronisation of the delivery of buses. The implementation of this contract will allow the Contractor to coordinate actions, which will relieve the Contracting Authority of the need to employ persons/specialists with the appropriate and legally required authorisations, whose task would be to control the contractors, settle the terms and other elements of the individual contracts. Additionally, there is currently no manufacturer on the market that produces both buses and charging systems, which means that one bus supplier, who selects a charging system supplier from the market, is the optimal solution for the Contracting Authority, which will result in the best results from the given outlays, limit the cost of contract performance, and also influence the highest possible level of technical readiness and reliability of the purchased buses and charging systems. The Contracting Authority has been operating electric buses and charging infrastructure for over 10 years. During the previous operation of the buses, the Contracting Authority has repeatedly encountered situations where a bus, due to an unidentified failure related to the bus charging process, had to cease the operation of electric buses due to a lack of energy in the energy storage of these buses. The lack of contract division minimizes the above risks, as one Contractor will analyze the problems that occur and solve them as quickly as technically possible. In view of the above, the lack of contract division is fully justified, purposeful and necessary to apply. 6.4. In accordance with art. 101, paragraph 4 of the Pzp, in the scope indicated by the Contracting Authority in the description of the subject of the contract and SWZ requirements or references to standards, European technical assessments, approvals, technical specifications and technical reference systems, as mentioned in art. 101, paragraph 1 and 3 of the Pzp - the Contracting Authority informs that (in each of the indicated cases) it allows equivalent solutions in this scope. The Contractor, who refers to equivalent solutions in relation to the above requirements or references of the Contracting Authority, is obliged to prove in the content of the offer in what scope it submits an equivalent offer and is obliged to present in the offer evidence that the supplies or services offered by it meet the requirements specified by the Contracting Authority. 6.4.1. To this end, the Contractor will present a list containing, at least: 1)The content of the original requirement defined by the Contracting Authority (references to standards, European technical assessments, approvals, technical specifications and technical reference systems) in relation to which the Contractor submits an equivalent offer. 2)A detailed description of the equivalent solution offered by the Contractor. Additionally, the Contractor will be obliged to submit with the offer evidence confirming the compliance (by the equivalent solution offered by the Contractor) with the requirements of the Contracting Authority in the form of a certificate issued by a conformity assessment body or a report of tests carried out by this body. The Contracting Authority will also accept other appropriate evidential means submitted by the Contractor, in particular the technical documentation of the manufacturer, and in the case where a given Contractor does not have access to certificates or test reports, as mentioned above, or the possibility of obtaining them within the appropriate time, provided that this lack of access cannot be attributed to the given Contractor and provided that the Contractor proves that the supplies or services performed by it meet the requirements, features or criteria specified in the description of the subject of the contract or criteria for evaluating offers or requirements related to the implementation of the contract. 6.4.2. The Contracting Authority informs that in the event of the use in the content of SWZ, trademarks, patents or origin, source or special process, which characterizes the products or services supplied by a specific Contractor, the Contracting Authority allows an equivalent solution, provided that the tendered subject of the contract has the same or better technical, substantive, user, quality, functional parameters. The Contracting Authority allows the use-of the rest of the part in SWZ.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Public-service buses – ZAKUP 40 SZT. NOWYCH ZEROEMISYJNYCH AUTOBUSÓW MIEJSKICH KLASY MAXI (EV) WRAZ Z NIEZBĘDNĄ INFRASTRUKTURĄ DO ICH ŁADOWANIA W STANDARDZIE PLUG-IN, STANOWIĄCYM INTEGRALNĄ CZĘŚĆ PROJEKTU PN. „ZAKUP AUTOBUSÓW ZEROEMISYJNYCH – GMINA MIASTO CZĘSTOCHOWA”
Miejskie Przedsiębiorstwo Komunikacyjne w Częstochowie S.A.PolandPublic-service busesLow-floor busesElectric busesDeadline in 35 daysPublished on Oct 25, 2026
Poland – Ambulances – Uzupełnienie infrastruktury transportowej w ramach Programu Ochrony Ludności i Obrony Cywilnej
Mazowiecki Szpital Wojewódzki im. św. Jana Pawła II w Siedlcach Sp. z o.o.PolandAmbulancesMiscellaneous medical devices and productsPassenger carsDeadline in 14 daysPublished on Oct 25, 2026
Poland – Ambulances – Zakup i dostawa ambulansów w ramach realizacji zadania pn. „Szpitale Przyjazne Wojsku – Zabezpieczenie logistyczne i zapewnienie ciągłości dostaw w SPZZOZ w Wyszkowie”
SAMODZIELNY PUBLICZNY ZESPÓŁ ZAKŁADÓW OPIEKI ZDROWOTNEJ W WYSZKOWIEPolandAmbulancesMedical equipmentsMiscellaneous medical devices and productsDeadline in 14 daysPublished on Oct 25, 2026
Poland – Helicopters – Dostawa dwóch śmigłowców z Systemem Obserwacji Lotniczej.
Polskie Sieci Elektroenergetyczne S.A.PolandHelicoptersDeadline in 14 daysPublished on Oct 25, 2026