France – Construction work for railways and cable transport systems – EOLE Mantes phases cible
Description
Earthworks, Drainage, Catenary / General Civil Engineering / Buildings / Platforms / Artworks, divided into 4 phases (Preparation Phase 5, and Phases 5, 6 and 7). The main works of the firm section are:
• Remodelling of the track layout of the Northern Bottleneck (GrVI tracks, V2GrV and Le Havre tracks);
• Commissioning of the Leapfrog connecting the Le Havre tracks to the Caen tracks (future V2C);
• Remodelling of the track layout of Mantes La Jolie Sud (V1Bis, V1GrV, Special tracks, Caen tracks, Service tracks of the Plaine Bundle and Buchelay Bundle Entrance);
• Commissioning of the Piquettes Connection connecting the Caen tracks to the Le Havre tracks (future V1H);
• Demolition of Buildings (Post, Centre, Satellites) following the commissioning of PAI 45 and 46;
• Reorganisation of the Mantes La Jolie Quays (Ends of Quay 2D, Raising of Quay 3, Reconstruction of Quay 4) and Mantes Station (Quay nose repair and installation of EAS systems);
• Catenary removal and connection works in the Bottleneck, Piquettes Connection and Leapfrog;
• Foundations and Installation of the new Mantes-La-Jolie footbridge.
Place of execution: Mantes-La-Jolie, Issou, Porcheville, Épône-Mézières, Guerville, Rosny-sur-Seine.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Construction work for water projects – REHABILITATION D OUVRAGES D EAU POTABLE
Nîmes Métropole (30)FranceConstruction work for water projectsReservoir construction worksOverhaul and refurbishment workDeadline in 31 daysPublished on Oct 22, 2026
France – Overhaul and refurbishment work – Réhabilitation d'un ensemble immobilier situé au 3/9/15 rue Jacques HILLAIRET à PARIS XII
Fonds de Garantie des Assurances Obligatoires de DommagesFranceOverhaul and refurbishment workFacade workJoinery workDeadline in 29 daysPublished on Oct 22, 2026
France – Building alteration work – Création d'un îlot test d'allotissement dans l'unité centrale de production culinaire (UCPC) du pôle logistique des Hôpitaux Universitaires de Strasbourg situé 10 rue Hannah Arendt à Strasbourg
HUS-Etablissement support du GHT 10FranceBuilding alteration workInstallation of partition wallsFloor laying and covering workDeadline in 26 daysPublished on Oct 22, 2026
France – Surface work for highways – A7 - Entretien des chaussées - Section Mondragon/Piolenc PR 152 à 162 (sens 1&2)
AUTOROUTES DU SUD DE LA FRANCE (ASF)FranceSurface work for highwaysGranules, chippings, stone powder, pebbles, gravel, broken and crushed stone, stone mixtures, sand-gravel mixtures and other aggregatesBitumenDeadline in 18 daysPublished on Oct 22, 2026