Switzerland – Sanitary works – Sanitär
Description
The planned new construction of the Allmend primary school aims to create a future-proof, sustainable, and pedagogically functional infrastructure for primary levels 1 to 6. The four-story building will be constructed using conventional timber construction methods on the school site and will replace the existing outdoor sports facility ("Roter Platz"). The geological and hydrogeological conditions on the site are considered challenging. In particular, two separate groundwater aquifers must be taken into account. The building site requires pile foundations (concrete displacement bored piles), as well as for service lines and inspection chambers (timber piles). With regard to flood protection, the new building meets the HQ300 requirements. The building services are located on the ground floor and top floor (no basement) to avoid damage from flooding. The building's load-bearing structure is based on a solid timber frame made of Fi/Ta. This is supplemented by three massive service cores made of reinforced concrete. The spiral staircases between the service cores are also made of reinforced concrete. The facade consists of prefabricated timber-framed external elements. The building will be certified according to SNBS 2.1 Construction (the target is Gold Certification). The energy supply is provided via a connection to the local district heating network SeeEnergy (winter heat, summer cooling water). All areas are equipped with underfloor heating. All floor coverings are made of polished industrial concrete and serve as thermal mass and light free cooling with regard to summer overheating hours. The control is via room thermostats to the specified setpoint value. For power generation, a building-integrated photovoltaic system will be installed on the roof, which takes over the function of the roof covering. Brise-Soleil constructions made of metal along the east and west facades serve as sunshades and form the structural weather protection of the facade. In the building services area, a mechanical ventilation system will be installed only in the areas of the inner cores and the auditorium. The classrooms receive fresh air via manual natural window ventilation. The building is fully accessible. For the planned school building with an overall height of approx. 19 m in hybrid construction, it is considered a building of medium height. The fire protection planning is carried out according to quality level QSS 2 of the BS guideline of the VKF. The surrounding design is based on the design concept "Centre 1st + 2nd Phase" and contributes to the development of a uniform public space in the centre of Horw. The schoolyard will be designed as a traffic-free, publicly accessible space, taking into account its use outside of school hours. The school garden is used exclusively for school purposes and is designed to be child-friendly and close to nature. In the sense of climate adaptation and biodiversity promotion.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Switzerland – Construction work – Gesamtprojekt St. Anna-Strasse - Bellerivehöhe - Schlösslihalde
Stadt Luzern, Umwelt- und Mobilitätsdirektion, TiefbauamtSwitzerlandConstruction workDeadline in 37 daysPublished on Oct 15, 2026
Switzerland – Construction work – FORUM UZH | BKP 272-02 Metallbauarbeiten, WG-13A Laterne
Kanton Zürich Hochbauaumt, Baubereich DSwitzerlandConstruction workMiscellaneous special-trade construction workInstallation services of television equipmentDeadline in 53 daysPublished on Oct 15, 2026
Switzerland – Construction work – Extension de la Haute Ecole de Santé de Genève
Etat de Genève, Département du Territoire - DT, Office cantonal des bâtimentsSwitzerlandConstruction workDeadline in 53 daysPublished on Oct 15, 2026
Switzerland – Construction work – Rénovation école du Bosson - Menuiserie
Ville d'Onex (Bureau d'architectes Burckhardt Architecture SA)SwitzerlandConstruction workJoinery workDeadline in 37 daysPublished on Oct 15, 2026