France – Landscaping work – GPSO - Travaux pour la mise en œuvre du programme des mesures compensatoires – Lots 1, 2, 3 et 4
Description
The subject of the present contract is the implementation of works for the compensatory measures programme of the GPSO project. This contract is a multi-operator framework agreement with subsequent contracts of a firm duration of 72 months, renewable 2 times 12 months. This contract includes the following lots:
Lot 1: Works for the implementation of the compensatory measures programme of the GPSO project in sectors 1 and 2;
Lot 2: Works for the implementation of the compensatory measures programme of the GPSO project in sector 3;
Lot 3: Works for the implementation of the compensatory measures programme of the GPSO project in sectors 4 and 5;
Lot 4: Works for the implementation of the compensatory measures programme of the GPSO project in sector 6.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Multi-dwelling buildings construction work – Réhabilitation de la Résidence Cartault - 92800 PUTEAUX
OPH Rives de Seine HabitatFranceMulti-dwelling buildings construction workDemolition workStructural shell workDeadline in 27 daysPublished on Sep 10, 2026
France – Construction, foundation and surface works for highways, roads – Travaux d'espace public secteur Segoffin (4 lots)
PARIS LA DEFENSEFranceConstruction, foundation and surface works for highways, roadsLandscaping workInstallation of outdoor illumination equipmentDeadline in 28 daysPublished on Sep 10, 2026
France – Roof-covering work – Marché de travaux d'installations photovoltaïques et de réfection d'étanchéité toiture sur les bâtiments de la Collectivité Européenne d'Alsace, Territoire du Haut-Rhin
Collectivité européenne d AlsaceFranceRoof-covering workSolar panel roof-covering workDeadline in 32 daysPublished on Sep 10, 2026
France – Road-surface painting work – Travaux de signalisation horizontale sur les voies rapides et dans les tunnels de la Métropole de Lyon
Métropole de Lyon DGEEPFranceRoad-surface painting workDeadline in 35 daysPublished on Sep 10, 2026