Finland – Works for complete or part construction and civil engineering work – Munkkiniemi (Talinpuisto-Laajalahdenaukio, Perustie) TP 21-26
Description
The construction site is located in Munkkiniemi and Munkkivuori. The mixed water sewer departing from Munkkiniemi is separated into a wastewater sewer and a stormwater sewer. For the sewers, the construction of the Valtatie 1 underpass will be carried out using trenchless methods. The contract also includes the renewal of water pipes. In Munkkiniemi, in addition to the park, water supply is renovated on Perustiellä and on the side street of Perustiet. In Munkkivuori, in addition to the park, water supply is renovated on Mesenaatinkuja and in Kielosaarenpuisto. The work is mainly carried out using open-cut methods. At the Valtatie 1 location, the stormwater sewer and wastewater sewer are underpassed/drilled. The pipes are mainly constructed on a pile slab. Approximately 5900m2 of pile slab is constructed. Approximately 13633 m of steel-reinforced concrete piles and 4350 m of steel pipe piles are constructed. Water pipe materials, sizes and quantity estimates: -Cast iron DN100 approximately 280m -Plastic pipe DN65 approximately 25m. Stormwater sewer materials, sizes and quantity estimates: -Concrete 1400mm approximately 470m -Concrete 1200mm approximately 235m -Concrete 500mm approximately 529m -Concrete 400mm approximately 60m -Concrete 300mm approximately 220m -Plastic 560mm approximately 105m -Plastic 400mm approximately 55m -Plastic 250mm approximately 60m. Wastewater sewer materials, sizes and quantity estimates: -Concrete 1400mm approximately 60m -Concrete 1200mm approximately 430m -Concrete 1000mm approximately 300m -Concrete 400mm approximately 75m -Concrete Qmax 500/750 approximately 250m -Plastic 400mm approximately 270m -Plastic 315mm approximately 85m -Plastic 250mm approximately 85. Manhole construction 1500B for sewer approximately 340m. See material procurement in more detail in the contract programme. The scope is presented in detail in the drawings. The tender documents are not directly available from the Tarjouspalvelu.fi portal due to the confidential information they contain for the contracting entity, and therefore the drawings are sent only to the shortlisted candidates in the negotiation phase upon request, after completing the confidentiality agreement for the preparation of the preliminary tender.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Finland – Construction work – SYK ÅA Vaasa Övningsskola gymnasium, lisärakennuksen purku ja uudisrakennus
Suomen Yliopistokiinteistöt OyFinlandConstruction workDeadline in 29 daysPublished on Sep 09, 2026
Finland – Ventilation installation work – Kaivokselan koulu korjaus ja tilamuutokset, ilmanvaihtourakka
Vantaan kaupunkiFinlandVentilation installation workDeadline in 71 daysPublished on Sep 08, 2026
Finland – Plumbing and drain-laying work – Kaivokselan koulu korjaus ja tilamuutokset, putkiurakka
Vantaan kaupunkiFinlandPlumbing and drain-laying workDeadline in 71 daysPublished on Sep 08, 2026
Finland – Construction work – Kokonaisurakka, peruskorjaus, Helsinki, Heka Itäkeskus Asiakkaankatu 4
Helsingin kaupunki, kaupunkiympäristön toimiala, asuntotuotantoFinlandConstruction workDeadline in 25 daysPublished on Sep 08, 2026