Poland – Refuse-incineration plant construction work – Przebudowa i zmiana sposobu użytkowania budynku magazynowego na budynek spalarni odpadów medycznych i weterynaryjnych, w którym zostanie wykonana instalacja do termicznego przekształcania odpadów medycznych i weterynaryjnych o wydajności do 10 ton na dobę (wydajność nominalna 9,6 Mg/dobę), budowa modułowej portierni, wiaty na odpady, ogrodzenia, utwardzenia terenu, wagi samochodowej(...)
Description
The subject of the Contract is the implementation of the investment entitled "Reconstruction and change of use of a warehouse building into a medical and veterinary waste incineration building, in which a thermal conversion installation for medical and veterinary waste with a nominal capacity of 0.4 Mg/h (9.6 Mg/day) will be installed, construction of a modular guardhouse, canopy for waste, fencing, ground hardening, vehicle scale, external filter, emission chimney and two sealed, double-shell buffer tanks for industrial wastewater, connections: water supply, sanitary sewerage and heating, external installations: water supply, sanitary sewerage, rainwater sewerage, gas, power cable line along with lighting poles". The Contract includes, in particular: the preparation of the technical design (TD) and the executive design (ED), supply, execution, assembly, integration, commissioning and handover for operation of the complete thermal conversion installation for medical and veterinary waste with a nominal capacity of 0.4 Mg/h (9.6 Mg/day), located in the existing hall, along with the execution of necessary construction, installation and land development works. The procedure is conducted in the competitive dialogue procedure based on art. 170 in conjunction with art. 153 points 3) and 4) of the Act. The detailed technical and functional scope of the Contract will be specified in the course of the dialogue with the Contractors. The detailed conditions and requirements regarding the implementation of the Contract are contained in Annex No. 1 entitled "Description of needs and requirements of the Purchaser (DNR) - Construction of a thermal conversion installation for medical and veterinary waste with a capacity of up to 10 tons per day (nominal capacity 9.6 Mg/day)". 2. Material scope of the Contract The listed documents are binding for the Contractor. The Contractor is obliged to execute the Contract in accordance with the provisions of generally applicable law, the environmental decision, the final building permit decision along with the approved PAB and PZT, DNR / DNR, Contract and documentation prepared by the Contractor. In the event of discrepancies between documents or works having significance for the implementation of the Contract, the Contractor is obliged to accept the solution ensuring compliance with the law, the environmental decision for the implementation of the project, the building permit decision along with the approved PAB and PZT and the purpose and requirements specified in the DNR / DNR. For the purposes of resolving technical, technological, design, functional, environmental and operational discrepancies, the following order of priority is adopted: 1) environmental decision; 2) final building permit decision along with the approved PAB and PZT; 3) DNR / DNR along with annexes; 4) Contract draft — in the scope of provisions regarding the method of implementation, acceptance, liability, deadlines, payments, guarantees, bonds, contractual penalties and change procedure; 5) technical, design, workshop, executive and post-execution documentation prepared by the Contractor. Documentation prepared by the Contractor, in particular FEED, Technical Design, Executive Design, workshop documentation, registration documentation and post-execution documentation, must be consistent with the documents indicated above and may not change, limit or reduce the requirements resulting from the documents of a higher level in accordance with the order of priority indicated above. The need to adapt the Contractor's documentation or the method of implementing the Contract to the documents indicated above does not constitute an independent basis for changing the Remuneration or extending the implementation deadline, unless such necessity results from circumstances independent of the Contractor, impossible to predict by an experienced Contractor acting with due diligence and at the same time the conditions for changing the Contract specified in the Contract and in the PZP provisions are met. From the scope of implementation, the electrical energy production system (cogeneration) is excluded, for which the environmental decision provides a gross electrical power of 150 kWe and a gross thermal power of 1500 kW, as well as the photovoltaic installation (PV) included in the energy analysis of the PAB. In the scope of implementation, the recovery of heat from flue gases is retained, implemented by a heat recovery boiler along with a heat transfer system to receivers. Both elements are included in the approved PAB and PZT, and their omission in the implementation constitutes a deviation from the approved design. The qualification of this deviation as significant or insignificant (art. 36a para. 5 PB) is presented by the Contractor at the FEED stage (point 2.1 lit. c, Stage Ia), and its consideration takes place in the procedure of point 2.1 lit. j) and author's supervision (point 2.1 lit. d). The Contractor includes in the technical design a reserve of space and mechanical and electrical interfaces enabling the future installation of the cogeneration system and the photovoltaic installation. The working pressure value of the steam, not less than 2.0 MPa, which the environmental decision links with the configuration with the cogeneration system, is not a binding parameter for the configuration without this system; the heat recovery boiler then operates as a heating unit, and a lower working pressure value is permissible.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Roadworks – Zabezpieczenie osuwiska wraz z odbudową DW 993 w m. Bednarka
Zarząd Dróg Wojewódzkich w KrakowiePolandRoadworksEngineering works and construction worksDemolition, site preparation and clearance workDeadline in 9 daysPublished on Nov 26, 2026
Poland – Road construction works – Rozbudowa drogi krajowej nr 63 na odc. Czyżew Sutki – Czyżew
Generalna Dyrekcja Dróg Krajowych i AutostradPolandRoad construction worksSite preparation workEngineering works and construction worksDeadline in 41 daysPublished on Nov 26, 2026
Poland – Sewage treatment works – Modernizacja Oczyszczalni Ścieków w Bukownie
Przedsiębiorstwo Wodociągów i Kanalizacji Spółka z ograniczoną odpowiedzialnościąPolandSewage treatment worksDeadline in 40 daysPublished on Nov 26, 2026
Poland – Construction work – Przebudowa budynku Urzędu Skarbowego w Krośnie w ramach zadania: „Przebudowa w celu poprawy efektywności energetycznej budynku Urzędu Skarbowego w Krośnie przy ul. Składowej 5”.
Izba Administracji Skarbowej w RzeszowiePolandConstruction workDismantling worksStructures construction workDeadline in 10 daysPublished on Nov 26, 2026