Skip to content
Back to search

Czechia – Energy and related services – Poskytování energetických služeb metodou EPC ve vybraných objektech v majetku města Kuřim

Město KuřimCzechiaPublished on Aug 10, 2026
No deadline given

Description

The subject of the public contract is the implementation of energy-saving measures in the contractor's facilities using the EPC method. This is a comprehensive public contract including preparation, including project design, implementation/construction of the designed measures, and subsequent long-term monitoring and evaluation of the results of the implemented energy-saving measures (for a period according to the SES, in the case of the City of Kuřim at least 15 years), where the supplier, with whom the Contract will be concluded, will provide the contractor with contractual guarantees/warranties for achieving the contractually agreed savings in energy costs and for achieving the expected economic benefits of the project. The supplier will independently propose specific energy-saving measures and include them in the EPC project, which will then be implemented in the facility (facilities). This project must also include the implementation of so-called mandatory measures specified in Section 2.6 of the Basic Document of the Tender Documentation (hereinafter also "ZD"). The proposed energy-saving measures will, according to the contractor's assumptions, cover the areas of heating, cooling, ventilation, lighting, and the consumption of hot and cold water. The supplier bears the relevant risk of failure in achieving savings from the implementation of the measures it proposes and implements. The subject of the performance of the public contract is, in accordance with the above, at least this scope of activities: 1. proposal of energy-saving and possibly other measures and technologies for the use of renewable energy sources for the contractor's facilities (see place of performance of the public contract), 2. preparation of the relevant implementation and project documentation for the implementation of the saving measures, if the given measure requires it, or technical documentation for professional measures, where project documentation for building permit or implementation documentation for construction (TZB - technical equipment of the facility) is not required by the Building Act, 3. ensuring the formalities related to obtaining a building permit, if the proposed measure will require it, 4. supply and installation of all saving measures (including any construction-related measures) and technologies for the use of renewable energy sources "turnkey", 5. preparation of documentation of the actual implementation of the proposed and mandatory measures, 6. preparation of operating rules for newly installed equipment, 7. training of the contractor's employees in the operation of the newly installed equipment, 8. financing the construction of all measures (the contractor does not provide advances), with the use of grants and the contractor's own resources 9. energy management (services including continuous monitoring and evaluation of achieved energy savings) for the duration of the warranty, including control of the installed equipment, 10. provision of a guarantee for achieving the expected cost savings for the contractually agreed period (for the duration of the warranty). 11. Communication and cooperation with processors of applications for grants for the agreed installed measures.

CPV codes

Energy and related servicesConstruction workHeating worksLighting equipment and electric lampsHeating, ventilation and air-conditioning installation workSolar photovoltaic modulesSolar installation

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders