Switzerland – Ventilation installation work – Lüftung
Description
The planned new construction of the Allmend Primary School aims to create a future-proof, sustainable, and pedagogically functional infrastructure for primary levels 1 to 6. The four-story building will be constructed using conventional timber framing on the school site and will replace the existing outdoor sports facility ("Roter Platz"). The geological and hydrogeological conditions on the site are considered challenging. In particular, two separate groundwater levels must be taken into account. The building site requires a pile foundation (concrete displacement bored piles), as well as for service lines and inspection chambers (wooden piles). In terms of flood protection, the new building meets the HQ300 requirements. The building services are located on the ground floor and the top floor (no basement) to avoid damage from flooding. The building's load-bearing structure is based on a solid timber frame made of Fi/Ta. This is supplemented by three massive service cores made of reinforced concrete. The spiral staircases between the service cores are also made of reinforced concrete. The facade consists of prefabricated timber frame external elements. The building will be certified according to SNBS 2.1 Construction (the target is Gold Certification). The energy supply is provided via a connection to the local district heating network SeeEnergy (winter heat, summer cooling water). All areas will be equipped with underfloor heating. All floor coverings are made of polished industrial concrete and serve as thermal mass and light free cooling with regard to summer overheating hours. The control is via room thermostats over the specified setpoint. For power generation, a building-integrated photovoltaic system will be installed on the roof, which serves as the roof covering. Brise-soleil construction made of metal along the east and west facades serve as sunshades and form the structural weather protection of the facade. In the area of building services, a mechanical ventilation system will be installed only in the areas of the inner cores and the auditorium. The classrooms will receive fresh air via manual natural window ventilation. The building is fully accessible. For the planned school building with an overall height of approx. 19 m in hybrid construction, it is considered a building of medium height. The fire protection planning is carried out according to quality level QSS 2 of the BS guideline of the VKF. The surrounding design is based on the design concept "Centre 1st + 2nd Phase" and contributes to the development of a uniform public space in the centre of Horw. The schoolyard will be designed as a traffic-free, publicly accessible space, taking into account its extracurricular shared use. The school garden is exclusively for school use and is designed to be child-friendly and close to nature. In the sense of climate adaptation and promotion of biodiversity.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Switzerland – Construction work – Neubau Klinikum 2, Phase 1, SKP 273, Schreinerarbeiten-Aufbahrung UG02
Universitätsspital BaselSwitzerlandConstruction workDeadline in 18 daysPublished on Oct 22, 2026
Switzerland – Facade work – Extension du dépôt Perrelet - Crépissage de façades
Transports publics de la région lausannoise SA - Ferrari ArchitectesSwitzerlandFacade workDeadline in 43 daysPublished on Oct 22, 2026
Switzerland – Construction work for buildings relating to education and research – BKP 271 Gipserarbeiten
Gemeinde Ebikon (Jung Meyerhans AG)SwitzerlandConstruction work for buildings relating to education and researchDeadline in 38 daysPublished on Oct 22, 2026
Switzerland – Construction work – tpg – Transformation et rénovation du CMB - LOT N°15 – Installations CVC – (CFC 242 – 244 - 144)
Transport publics genevois (tpg)SwitzerlandConstruction workPlumbing and sanitary worksDeadline in 39 daysPublished on Oct 22, 2026