Germany – Building construction work – Neubau Campus Zentralklinikum Magdeburg – NCZMD –Ausführungsleistungen Ausbau
Description
The Magdeburg University Hospital A.ö.R. (UKMD), together with the Faculty of Medicine (FME) of Otto-von-Guericke University (OvGU), forms the Magdeburg University Medicine (UMMD). This merger unites research, teaching (FME) and patient care (UKMD). With approximately 1,100 beds, the university medicine facility is the largest hospital in the city of Magdeburg and the largest medical facility in northern Saxony-Anhalt. The hospital's physical structure is characterised in particular by decentralisation. The main campus, with a total area of approximately 300,000 m2, is located at Leipziger Straße 44. The University Clinic for Obstetrics and Gynaecology, Reproductive Medicine, and the inpatient department of the University Eye Clinic are located at the external site at Gerhart-Hauptmann-Straße 35 (approximately 3 km as the crow flies). The main campus is characterised by a pavilion structure. Clinics, outpatient departments, laboratories, logistics, as well as research and teaching, are decentralised across the site. In total, there are 26 clinics and 19 institutes, as well as other independent or associated areas, distributed across both sites. In addition to research and teaching, Magdeburg University Medicine offers the full range of multidisciplinary and highly specialised medical care. The entire university medicine facility employs approximately 4,300 staff in research, teaching, patient care and administration. In addition, approximately 1,500 students are enrolled at the Faculty of Medicine, as well as others in the Master's programme in Immunology. The current physical structure of the UKMD is characterised by a dislocated building structure, outdated technical infrastructure, long distances and outdated functional structures. There is an urgent need for action to prepare the UMMD for the future challenges of university medicine and to solve pressing structural problems. The new central hospital is intended to bring together the previously dislocated clinics and functional units of the university hospital in a centralised and structurally optimised structure, thus resolving an outdated situation. Taking into account the existing areas in buildings 60a and 60b, a large part of the clinical areas and a predominant proportion of the total usable areas of the UKMD will be located in the Central Hospital complex in the future. The new construction of the "New Campus Central Hospital" is the largest construction project in the state of Saxony-Anhalt and is critical to the future viability of the site at Leipziger Straße. The planning and construction implementation is divided into several individual, interdependent sub-projects. Due to the complexity of the construction measures and the heterogeneous nature of the projects, this is necessary both in terms of content and organisation. The current budget approved for the overall project is approximately 1 billion €, half of which is allocated to the new construction of the Central Hospital (construction phases 1 and 2). The focus of the building function should be on the harmony of medically up-to-date and future-proof processes, efficient operational structures and economical solutions. The following requirements must also be mandatorily taken into account: - It must be ensured that modern, safe, competitive and legally compliant healthcare can be provided at the site of the Magdeburg University Medicine and that current safety risks are minimised. - The planning should be future-proof and innovative. - The highest possible degree of automation should be taken into account. - The planning of the Central Hospital must be carried out in such a way that a highly flexible building is created. This flexibility should enable re-use for other medical disciplines; possibly as a result of a changed medical strategy. The most complex and medically important project is the new construction of the new central building for inpatient care, which, according to the specifications of the current master plan, directly adjoins the existing buildings 60a and 60b and is intended to form a unit with them. The new central building is a highly complex project with multifactor dependencies and a large number of users in planning, execution and operation, but also in the preparation of the procedure. It is also challenging to integrate the new building into the existing structures, taking into account existing, partially listed buildings. Due to the complex requirements for the new construction of the Central Hospital, the contracting entity, the IPS GmbH, has decided to implement this part of the overall project as an Integrated Project Delivery (IPA). The following IPA partners will be commissioned for planning and execution: Key trade 1: ELT execution – Technical equipment (electrical systems) Key trade 2: HLS execution – Technical equipment (excluding electrical systems) Key trade 3: Technical equipment design services Key trade 4: Extended design services Key trade 5: MSR/GLT planning and execution Key trade 6: Medical technology planning and execution (LOT 473), turnkey with LOT 300 and 400 Key trade 7: Structural design services Key trade 8: Execution of finishing work Key trade 9: Execution of extended rough construction/special civil engineering
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Tiling work – Fliesen- und Werksteinarbeiten, Gymnasium und Quartiershaus
Landeshauptstadt München, BaureferatGermanyTiling workDeadline in 33 daysPublished on Sep 09, 2026
Germany – Installation of doors – Amplonius-Gymnasium Erweiterung um einen naturwissenschaftlichen Trakt - Tischlerarbeiten (Innentüren)
Stadt Rheinberg - Zentrale VergabestelleGermanyInstallation of doorsDoorsDeadline in 35 daysPublished on Sep 09, 2026
Germany – Electrical wiring and fitting work – Neubau Grundschule Sieker-Elektroarbeiten
Stadt Bielefeld - Amt für Zentrale LeistungenGermanyElectrical wiring and fitting workDeadline in 32 daysPublished on Sep 09, 2026
Germany – Installation of partitioning – GS Ost Saarbrücken -Sanierung im Bestand - Instandhaltung WC Anlagen
Gebäudemanagementbetrieb der Landeshauptstadt Saarbrücken - GMSGermanyInstallation of partitioningDeadline in 33 daysPublished on Sep 09, 2026