Back to search
France – Refurbishment work – Réhabilitation Résidences Lully & Lalo - st-etienne
ALLIADE HABITATFrancePublished on Jun 29, 2026
No deadline givenDescription
This consultation concerns the rehabilitation of two housing complexes located at: Residence Lully 1 / Lalo - HP C307 at 1 to 11 square Jean-Baptiste Lully and 1 allée Edouard Lalo 42000 SAINT ETIENNE. This residence consists of 109 dwellings distributed in 2 buildings. Residence Lully 2 - HP C309 at 6 to 16 square Jean-Baptiste Lully 42000 SAINT ETIENNE. This residence consists of 60 dwellings distributed in 2 buildings. Planned start date for services: October 2026 Duration: 20 months, including 2 months of preparation. Private works contract.
CPV codes
Refurbishment workStructural shell workFacade workWaterproofing workJoinery workInstallation of metal joinery except doors and windowsPlumbing and drain-laying workVentilation installation workElectrical fitting workLift and escalator installation workInstallation of metal structuresPainting workPlastering workFloor laying and covering workWall-tiling workHeating worksSanitary fixture installation workElectrical installation work of heating and other electrical building-equipmentIntercom equipment
Documents & submission
AI summary
Sign in for an AI summaryContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Wall-covering work – Accord-cadre à bons de commande pour des travaux d'entretien courant de Peinture Revêtements Muraux et Revêtements de sols
OPH de la Haute-SaôneFranceWall-covering workFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Installation of road lighting equipment – Travaux de Génie Electrique sur le territoire de Grand Besançon Métropole
Grand Besançon MétropoleFranceInstallation of road lighting equipmentInstallation of outdoor illumination equipmentDeadline in 33 daysPublished on Sep 08, 2026
France – Wall-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de peinture et revêtements muraux
OPH de la Haute-SaôneFranceWall-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Floor-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de revêtements de sols
OPH de la Haute-SaôneFranceFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026