Germany – Installation of pipe system – FW-Verbindungsleitung Vorwerk - St. Lorenz, Lübeck (TWB)
Description
The project aims to expand and optimize the energy infrastructure by connecting two existing district heating networks via a approximately 3.2-kilometer long transport pipeline between Schwartauer Allee (Vorwerk) and Ziegelstraße (St. Lorenz) in Lübeck. Along the route, some sections already exist as existing pipelines. The three planned construction sections close the remaining gaps and thus complete the overall connection. In total, approximately 2.5 kilometers of new pipelines will be laid to create a continuous and efficient heat transport route. Technically, predominantly pipe dimensions DN 400 (with 630 mm outer diameter per pipe) and in the area of Ziegelstraße DN 200 (DN 350) are used, adapted to the existing infrastructure and traffic conditions. 1. BA [Schwartauer Allee (Nord)], DN400, 750m: 10/2026 - 06/2028 2. BA (Schwartauer Allee), DN400, 950m: 10/2026 - 08/2028 3. BA (Ziegelstraße), DN200, 780m: 03/2027 - 11/2028 The construction work includes, in particular, civil engineering, pipeline and qualified welding work according to the applicable district heating regulations. A prerequisite for the execution is the submission of an independent certification by an accredited organization, such as according to AGFW FW 601 (FW1,st), to ensure a professional and quality-assured implementation.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Plasterboard works – Trockenbauarbeiten 4. - 6. BA (21940059 / AG KI / Umbau, eAkte u. Datennetz_MF)
Land Schleswig-Holstein endvertreten durch Gebäudemanagement Schleswig-Holstein AöRGermanyPlasterboard worksDeadline in 28 daysPublished on Oct 18, 2026
Germany – Road construction works – Grundhafter Ausbau der Wallrothstraße mit statischen Hangsicherungen sowie Neubau eines gemeinsamen Geh-/Radweges in 99734 Nordhausen; 2. Bauabschnitt
Stadtverwaltung NordhausenGermanyRoad construction worksSupporting wallsDeadline in 31 daysPublished on Oct 18, 2026
Germany – Sports hall construction work – Prallwand Sporthalle
Landratsamt EichstättGermanySports hall construction workInstallation of gatesFloor and wall covering workDeadline in 7 daysPublished on Oct 18, 2026
Germany – Building construction work – Kita Ringstraße
Stadt Waiblingen -GB Hochbau & Gebäudemanagement-GermanyBuilding construction workDeadline in 29 daysPublished on Oct 18, 2026