Skip to content
Back to search
This tender has expired.

Germany – Engineering services – Sanierung der Festhalle Stöckwiese in Bietigheim - Tragwerksplanung

Gemeindeverwaltung BietigheimGermanyPublished on Oct 04, 2026
Deadline passed

Description

The municipality of Bietigheim intends to carry out comprehensive renovation and functional modernisation of the municipal Festhalle in the Stöckwiese. The Festhalle is a central venue for cultural, social and local association life and has particular significance in connection with the annual Volksfest. In addition, the building is used throughout the year for a wide range of events and serves as a parking area for mobile homes during the winter months. The Festhalle is located on the municipal property Flst.-Nr. 938/4 in Stöckwiese 7 in 76467 Bietigheim. The building was constructed in the year 2000 and is not a listed building. The essential technical trades, particularly the electrical installation, the drinking water and waste water installation as well as the roof construction including roof waterproofing, also date from the year of construction 2000. The hall is not heated; heating is only available in the ancillary rooms. The building consists of a large event hall with a stage and bar area, several ancillary and functional rooms as well as a smaller hall arranged at the rear. The Festhalle is not bounded by a separate property, but is part of the large municipal property Flst.-Nr. 938/4, on which the outdoor and access areas required for events are also located. In the course of ongoing operations, numerous structural, technical and functional deficiencies have been identified in recent years. In addition to age-related damage to the building fabric, there are considerable defects in the technical building equipment and in the infrastructure of the outdoor facilities. The aim of the measure is the sustainable renovation and modernisation of the Festhalle in order to ensure long-term economic, safe and functional operation and to meet the requirements of today's event venues. The Festhalle has been included in the state renovation programme "Alter Ortskern" as a so-called island solution. Taking into account the annual Volksfest, the construction is currently scheduled for the period from September 2027 to July 2028. The planning is to be aligned accordingly with this binding time frame. The project scope includes both measures on the existing building and on the outdoor facilities. These include in particular: • structural renovation measures on the building including roof, interior fittings and stage area, • renewal and modernisation of the electrical infrastructure including lighting, power supply and event technology, • renewal and expansion of the drinking water and waste water infrastructure, • functional adaptation of the sanitary facilities, • improvement of storage and operational processes, • adaptation of the outdoor facilities including technical access, pipeline infrastructure and event areas, • implementation of necessary civil engineering measures to renew the supply and disposal lines. The known defects and requirements form the basis for further planning. In the course of further planning, these are to be checked, assessed in terms of planning and developed into an economical, technically coherent and grant-eligible overall concept. The following key dates are planned: • Start of planning: Immediately after the award • Completion of LPH 3: February/March 2027 • Start of construction: Mid-September 2027 (after Mallorca Party) • Completion: Before the Volksfest in July 2028 Due to funding conditions and planned events, the construction time between September 2027 and July 2028 must be strictly observed. This must be taken into account in the planning and execution. The approximate cost estimate (as of 04/2026) amounts to: Cost Group 300 1,241,925.41 € gross Cost Group 400 136,945.20 € gross You will find an overview of the as-built drawings of the Festhalle in the appendix. The subject of this invitation to tender is the structural design in accordance with §§ 49 ff. HOAI with phases 1-6. There will be a phased award. In phase 1, the performance phases 1-4, including the special service "proof of earthquake protection", will initially be awarded, and in phase 2, the performance phases 5-6, including the special service "engineering control of the execution of the structure for conformity with the approved static documents" (performance phase 8) will be awarded. There is no legal entitlement to a complete award.

CPV codes

Engineering services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders