Austria – Structural steelworks – (ProVia-ID 148916) AS17 Metall- und Glasbau Hst. Tosters
Description
As part of the measures to maintain the existing infrastructure of the ÖBB route Feldkirch (AT) - Buchs SG (CH), the Feldkirch Tosters stop will be newly built. The new construction includes, for example, a new pedestrian subway, reinforced concrete structure for technical rooms, foundations for equipment, new platform, weather protection, access area, infiltration basin, drainage, substructure, creation of new cable ducts, and the substructure of the switchgear station of the EK km 8,125, as well as the demolition of the stop in Tisis with a planned construction start in December 2025. An international line closure is planned from 14.06.2026 to 14.10.2026.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Austria – Works for complete or part construction and civil engineering work – Lustenau - Neubau Passerelle L203 - Baumeisterarbeiten
Marktgemeinde LustenauAustriaWorks for complete or part construction and civil engineering workBridge construction workDeadline in 52 daysPublished on Sep 13, 2026
Austria – Motorway construction works – A02 Süd Autobahn, INSB V03 - V04.2, AB-Km 339,70 - AB-Km 342,58 - Instandsetzung Straße und Brücke
Autobahnen- und Schnellstraßen- Finanzierungs-AktiengesellschaftAustriaMotorway construction worksDeadline in 31 daysPublished on Sep 13, 2026
Austria – Building construction work – Konzeptverfahren „Am Seebogen Mitte“ – Verkauf und Realisierung Bauplätze G3, G8, G9A und G9B (Losweise Vergabe)
Wien 3420 aspern Development AGAustriaBuilding construction workArchitectural, construction, engineering and inspection servicesUrban development construction workNo deadline givenPublished on Sep 13, 2026
Austria – Construction work – (ProVia-ID 159279) Lieboch - Köflach; GKB; Streckenattraktivierung Abschnitt 2; Baulos 15, Verkehrsstationen zzgl. HW-Freistellung
ÖBB-Infrastruktur AGAustriaConstruction workDeadline in 36 daysPublished on Sep 13, 2026