Ireland – Fasteners – 9097 - Supply of Fasteners
Description
IÉ has an on-going requirement for the supply of standard, bespoke and safety critical engineering fasteners, which are used in all rolling stock running maintenance and heavy maintenance activities. It is proposed to establish a multi- party, multi lot agreement for the supply of fasteners in various quantities to numerous Iarnród Éireann locations nationwide. The proposed lots are: Lot 1 - General Purpose Fasteners: Manufactured and certified to specified international standards. Lot 2 - Safety Critical Application Fasteners: Manufactured to specified international standards and subject to supplementary quality assurance checks as specified by IÉ to ensure compliance with CME Safety Management System for safety critical equipment. Lot 3 - Bespoke Application Fasteners: Manufactured to a standard prescribed by IÉ and subject to supplementary quality assurance checks as specified by IÉ to ensure compliance with CME Safety Management System for safety critical equipment.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Ireland – Paints, varnishes and mastics – Single Party Framework for The Supply of Paint
Beaumont Hospital_403IrelandPaints, varnishes and masticsPaintsOil and water paintsDeadline in 23 daysPublished on Sep 03, 2026
Ireland – Signs and related items – Multi-Party Framework for the Printing, Refurbishing, and Installation of Internal and External Signage, including Graphic Design
Mayo Sligo and Leitrim ETBIrelandSigns and related itemsSigns and illuminated signsSign materialsDeadline in 20 daysPublished on Aug 26, 2026
Ireland – Prefabricated buildings – 3 No. Glamping pods, (2no.1 bedroom pods and 1no.2 bedroom family pod) 1 no. sauna pod, on-site wastewater treatment system, and all associated ancillary works at The Glebe, St. Mullins, Co.Carlow.
Glamping at the GlebeIrelandPrefabricated buildingsFoundation workWastewater treatment plant construction workDeadline in 20 daysPublished on Aug 26, 2026
Ireland – Paints – 9899 Supply of Rolling Stock Paint
Iarnród Eireann-Irish RailIrelandPaintsNo deadline givenPublished on Aug 19, 2026