Skip to content
Back to search

Germany – Architectural and related services – Gemeinde Kleinblittersdorf - Energetische Sanierung der Spiel- und Sporthalle Kleinblittersdorf

Gemeinde Kleinblittersdorf - Fachbereich 3 – Bauen Wohnen UmweltGermanyPublished on Jun 23, 2026
No deadline given

Description

The municipality of Kleinblittersdorf plans the energy renovation of the sports and event hall in Kleinblittersdorf. As part of the renovation, the following sub-measures are to be implemented:

1. Dismantling of the old CHP and installation of a new climate-neutral central heating system to supply the hall (incl. new metering and control technology in addition to a cascade air heat pump for heat supply during the transition period and for hot water preparation of the showers).

2. Renewal of the electrical supply (meter cabinet, sub-distribution, cabling)

3. Renovation of the trapezoidal roof (replacement of the wooden supporting structure in some areas, renewal of the roof insulation and plumber's work such as gutters, downpipes + lightning protection system)

4. Renewal of the window elements along the gallery

5. Installation of an exhaust air system with heat recovery in the area of the showers

6. Erection of a shed roof over the changing rooms, showers and ancillary rooms including insulation of the existing flat roof area and installation of roof lights for lighting

7. Erection of a photovoltaic system in the area of the shed roof over the changing rooms with 25kWp module power

8. Renovation of the flat roof over the equipment rooms including fall insulation

9. Renewal of the window front along the east side

10. Renovation of the complete hall ceiling by means of ball impact-resistant sheet metal panels and acoustic pads

11. Renovation of the emergency power system

12. Renovation of the sheet metal panel ceiling in the foyer as a ball impact-resistant acoustic ceiling including LED lighting

13. Renovation of the escape route doors in the area of corridor, gallery and entrance door to the upper and lower car park

14. Installation of an all-round ETICS (external wall insulation) made of mineral wool insulation

It is planned to implement the sub-measures in the following construction phases:

1. Construction phase: sub-measures 1-5

2. Construction phase: sub-measures 6-11

3. Construction phase: sub-measures 12-14

The renovation measures are to be completed by the end of Q3 2029.

CPV codes

Architectural and related servicesArchitectural, engineering and planning services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders