Skip to content
Back to search

Germany – Medium-voltage cable – 2026-1004980_Flughafen München_3. Stromnetz, Beschaffung Mittelspannungs-Kabel

Flughafen München GmbHGermanyPublished on Jun 17, 2026
No deadline given

Description

The project "Flughafen München - Errichtung 3. Stromnetz" involves the construction of a new, third medium-voltage network (20 kV) at Munich Airport. The aim is to ensure the sustainable and future-proof energy supply of the airport, particularly for the integration of electric mobility and photovoltaic systems. The 3rd network is to provide a transport capacity of up to 80 MVA in 2 expansion stages (2 x 40 MVA) and consists of two parallel heavy-duty rings, which, via heavy-duty stations (SLTS) and their associated supply rings, ensure the energy distribution with numerous medium-voltage substations (MS-US). This delivery includes - medium-voltage cables (20kV) for the connection between the SLTS and MS stations. The installation of the cables will be carried out by one or more contractors for the civil engineering lots. Detailed information can be found in the tender documents.

CPV codes

Medium-voltage cablePower distribution cables

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders