Skip to content
Back to search
This tender has expired.

Poland – Construction work – Wykonanie dokumentacji projektowej oraz robót budowlanych dla zadania pn.: " Odtwarzanie zbiorników retencyjnych w leśnictwie Wielkie Oczy oraz Przebudowy przepustu na mostek na drodze leśnej nr inw. 220/1139"

Skarb Państwa Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo LubaczówPolandPublished on Aug 30, 2026
Deadline passed

Description

The subject of the contract is the design, obtaining all the necessary legal agreements and permits required to obtain a building permit and commence construction works, the execution of construction works based on the obtained documents, and the execution of a natural inventory before the commencement and after the completion of the construction works for the task "Restoration of retention ponds in the Wielkie Oczy Forest District and reconstruction of the culvert on the forest road no. inv. 220/1139" with the following parameters:

1.1 "Restoration of retention ponds in the Wielkie Oczy Forest District" with the following parameters: The subject of the implementation is the restoration of retention ponds with a total area of approximately 3.0 ha, including the execution of earth dams and hydrotechnical facilities, including 5 emergency overflows. Basic parameters of 5 ponds - total area: approx. 3.0 ha (30,000 m²) - average depth: 1.2 m - total retention capacity: min. 28,000 m³ - Total length of 5 dams with a crown width of 2-3 m in total: approx. 270 m (5 sections), The scope of earthworks includes: - shaping the pond bowl, including profiling the pond bottom and internal and external slopes, - execution of earth dams, - construction of 5 overflows/weirs. The pond bottom will remain partially in its current form and shape, and partially, as described above, it may be deepened for the purpose of extracting material to execute earth dams. The following depth variations have been accepted: - shoreline zone: 0.3–0.8 m, - central zone: 0.5–1.0 m, - deep zone: up to approx. 2.0 m. Slope of slopes: internal slopes: 1:2 to 1:5, Earth dams - The execution of five dams with a total length of approx. 270 m is planned. Parameters: - crown width: 3.0–4.0 m, - height: approx. 2.0 m, - slope of slopes: 1:2 -1:3. The dams will be made of mineral soils, excavated from the pond bowl and compacted in layers. In case of the presence of permeable soils, the execution of a sealing core from cohesive soils is envisaged. Overflow/Weirs In order to ensure hydrological safety, 5 overflows/weirs have been designed, allowing for the constant flow of water – maintaining a constant flow and draining excess water. Earthworks volume balance The volume of earthworks related to the shaping of the pond bowl is: Volume of embankments (dams) Assuming an average cross-sectional area of the dam of approx. 9.0 m²: V ≈ 270 m × 9.0 m² = 2,430 m³. Taking into account technological losses and compaction: ≈ 2,500 – 3,000 m³. Summary of volume balance: Excavation volume: 2,500 – 3,000 m³. Embankment volume: approx. 2,500 – 3,000 m³. Excess spoil: 0 m³. Spoil disposal All spoil will be used on the investment site for: building dams, shaping slopes, land levelling. It is estimated that 100% of the spoil will be used on site. All design solutions will require the ongoing approval of the contracting authority. 1.2. The subject of the planned undertaking is the reconstruction of the existing culvert - on the bridge on the forest road no. inv. 220/1139 in the Wielkie Oczy Forest District, The scope of works will include in particular: a) demolition of the existing culvert with concrete pipes and headwalls b) execution of a new bridge structure - a steel span with a corrugated sheet construction, c) execution of headwall reinforcement in the form of a stone pitch, d) restoration of access roads with a bituminous surface on the object and before and after the object with a total length of approximately 100 m. The width of the bridge should ensure the execution of a surface on the bridge of min. 3.5 m width and verges of 2 x 1.5 m, and its clearance will result from calculations and agreements with the watercourse administrator and the obtained water permit.

CPV codes

Construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders