Skip to content
Back to search
This tender has been withdrawn.

Croatia – Construction, foundation and surface works for highways, roads – „Rekonstrukcija županijske ceste ŽC 6224 od km 1+970 do km 11+740 (Faza I)“ te radovi na zahvatu „Aglomeracija Račišće, sustav odvodnje otpadnih voda Račišće – Faza I" i „Odvodnja otpadnih voda naselja Žrnovo – 1. Faza“

Županijska uprava za ceste na području Županije Dubrovačko-NeretvanskeCroatiaPublished on Sep 29, 2026
Deadline passed

Description

The subject of the procurement includes the „Reconstruction of the county road ŽC 6224 from km 1+970 to km 11+740 (Phase I)“ of the investor County Road Administration of Dubrovnik-Neretva County and works on the lot „Račišće Agglomeration, wastewater drainage system Račišće – Phase I" and „Wastewater drainage of the settlement Žrnovo – 1. Phase“ of the investor NPKLM vodovod d.o.o. Korčula. 1. The project envisages the reconstruction of the section of the county road Ž6224 (Korčula-Račišće) from the intersection with the state road D118 to the settlement Račišće, approximately 11+740 km long. The lot is divided into three phases. The subject of this public procurement procedure is Phase 1 from st. 1+970,00 to st. 11+740,00. The road runs predominantly in the east-west direction from the city of Korčula to the place Račišće. The main objective of the project is the complete renewal of the subject section of the county road Ž6224, adequate solution of existing connections, thorough renewal of the carriageway, solution of road drainage, protection/relocation of existing utility infrastructure, construction of a new public lighting system, construction of necessary retaining and revetment walls, arrangement of parking and rest areas along the route, as well as the construction of a new continuous footpath along the carriageway. The length of the road section within Phase 1 is approximately 9+770.0 km. The works are carried out in accordance with the existing building permit: CLASS: UP/l-361-03/19-01/000327, URBROJ: 2117/1-23/2-5-20-0010 of 6.5.2020., CLASS: UP/l-361-03/21-01/000202, URBROJ: 2117/1-23/2-5-21-0006 of 15.6.2021. The procedure involves an amendment and supplement to the building permit in which a building permit is requested for Phase 1, which is the subject of this procurement and the subject of secured EU funds, from st. 1+970,00 to st. 11+740,00. The dynamics of the implementation of the works is in accordance with the dynamics of the resolution of property-related matters: Pupnat Cadastre Municipality, Račišće Cadastre Municipality, Žrnovo Cadastre Municipality and part on maritime property. The contractor is the Contracting Authority - County Road Administration of the Dubrovnik-Neretva County. 2. The project envisages works on the lot „Račišće Agglomeration, wastewater drainage system Račišće – Phase I" and „Wastewater drainage of the settlement Žrnovo – 1. Phase“ of the investor NPKLM vodovod d.o.o. Korčula. The works are carried out in accordance with the building permit CLASS: UP/I-361-03/23-01/000049, URBROJ: 2117-23-2/5-23-0020 of 3.8.2023. and CLASS: UP/I-361-03/22-01/000219, URBROJ: 2117-23-2/5-23-0029 of 19.1.2023. The contractor of this part of the project is NPKLM vodovod d.o.o. Korčula. The subject works are carried out in accordance with the Bill of Quantities, which is an integral part of this Procurement Documentation. The works have been combined into one public procurement procedure due to their spatial and temporal interrelation and more efficient coordination of implementation. The contracting authority has not divided the subject of procurement into groups because the reconstruction of ŽC 6224 (Phase I) and the works on the drainage systems of Račišće and Žrnovo, according to the place and time of fulfilment, form a single technical and implementation unit: they are carried out in the same area and require coordination of all types of construction works. Both projects are implemented in the same cross-section of the road, so one contractor can operatively implement them, while two contractors in the same cross-section would slow down or prevent the implementation of the works, with the risk of mutual interference and transfer of responsibility for the deadline and quality. One contractor ensures the coordination of dynamics, single responsibility and more economical organisation of the construction site. The market competition is not limited because it is a matter of usual works in low-rise construction, which are carried out by a wide range of economic entities in an open procedure with reasonable conditions of capacity, with permitted joint bidding and subcontracting, which enables the participation of small and medium-sized enterprises. The project documentation of this public procurement procedure is available at the following link: https://drive.google.com/drive/u/0/folders/1degaXhh5LFuiwMil0AAWDFH8_pnHGdal

CPV codes

Construction, foundation and surface works for highways, roadsConstruction work for water and sewage pipelinesSewerage workRoad construction worksPaving and asphalting works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders