Germany – Construction work for highways, roads – Verkehrsanlagen und Freiflächen, 8. Bauabschnitt, Konrad 1
Description
The subject of this tender is civil engineering, road construction, drainage, media duct, cable trench, lightning protection, and engineering construction works within the Konrad 1 shaft system. The described services include corresponding demolition, dismantling, earth, excavating, and disposal/recycling works. In the course of the dismantling and new construction, the following approximate volumes will be generated:
1. Dismantling/Demolition/Recycling/Disposal of: Type of Service Quantity
2. General Construction Costs
Hedge and bush clearing 750 m2
Tree felling 76 units
Chain-link fence with posts 240 m
3. Disposal and recycling of demolition materials
BM-F0 soil 8240 t
BM-F1 soil 4120 t
BM-F2 soil 3090 t
BM-F3 soil 2060 t
DK I soil 2000 t
DK II soil 1000 t
DK III soil 800 t
Construction debris/concrete demolition RC-1 80 t
Non-hazardous waste AVV170904 non-hazardous 5 t
Disposal of metal scrap 1 t
4. Road construction
Asphalt milling 10150 m2
Removal of bituminous pavement 100 m3
Removal of unbound layer 500 m2
Concrete demolition 50 m3
Removal of paving, paving slabs, grass grid paving and concrete surfaces 1110 m2
Removal of block steps 10 units
Removal of curbs (high and low) 630 m
Removal of concrete drainage channels 170 m
Removal of road drains 23 units
Removal of ACO channels 20 m
Removal of steel gratings 4 units
Removal of metal railings 40 m
Removal of track system 90 m
Removal of wooden poles 5 units
Removal of rails and track ballast/bedding 12 m
Removal and recycling of shotcrete 40 m3
Removal of drainage pipes 10 m
Removal of steel posts 4 units
6. Media duct 01ZZP
Demolition of media duct base, walls, ceiling 30 m3
Recycling of media duct construction debris 65 m3
Disposal of reinforcing steel 2 t
7. Retaining wall
Site clearance (stones, wall remains, fences, rubble, litter, vegetation, rootstock) 360 m2
Pipe demolition 24 m
2. Production of: Type of Service Quantity
2. General Construction Costs
Clearing of cleared land 750 m2
4. Road construction
Improvement of subgrade 500 m3
Laying of GRK4 geotextile 3000 m2
Creation of depression 70 m
Installation of compactable soil 400 m3
Topsoil cover with grass seed 850 m2
Production of frost protection layer B2 5070 m3
Production of crushed stone base course 14010 m2
Production of sand-slurry layer 1200 m2
Production of berms 400 m2
Production of seepage string 1700 m
Laying of seepage pipe 1250 m
Production of frost protection zones for drainage of formation drainage 40 units
Production of plastic shafts 4 units
Production of plastic pipe 300 m
Installation of road drains 41 units
Installation of road drain covers 39 units
Installation of D400 box culvert 55 m
Production of pipe connections/manhole connections/branches/fittings 537 units
Production of high curb including radius and drop stones 675 m
Production of low curb 2415 m
Production of round curb 5 m
Production of grass edge 100 m
Expansion joints in channel and curb area 270 units
1r-curb channel 1780 m
2r-curb channel 630 m
3-row trough channel 260 m
Production of concrete paving strip in front of curb 16 m
Paving 1410 m2
Laying of grass grid paving 470 m2
Installation of subbase 11 m3
Installation of gravel for splash protection strip 115 m
Renewal of dimple sheet 20 m2
Production of concrete paving strip 430 m
Production of asphalt base course from AC 32 T N 12150 m2
Production of asphalt wearing course from AC 11 D N 12150 m2
Spraying of bitumen emulsion 12150 m2
Production of joint between channel and asphalt surface 3000 m
Production of trench for cable protection pipe 75 m
Installation of cable protection pipe DN 90 200 m
Connection to existing lines 4 units
Formation level for foundation base of concrete media duct 9 m2
Cleaning layer of filter concrete 8 m2
Installation of concrete cable duct 8 units
Installation of concrete cable duct cover 16 units
Installation and compaction of crushed stone base course material 1,5 m3
5. Civil engineering works
Lightning protection shaft hall
Production of trench for ring earthing 4,5 m3
Production of deep earthing hole 8 units
6. Media duct 01ZZP
Production of excavation pit 110 m3
Backfilling of excavation pit 120 m3
7. Retaining wall ZZM
Production of retaining wall including corner/offset areas & special area 26 m
Drainage pipe DN 500 4 m
Drainage pipe DN 160 24 m
Flushing/inspection/collection shafts concrete DN 1000 2 units
Railing with knee rail and handrail 26 m
8. Fire water
Above-ground hydrant DN 100 2 units
Double flange DN 100 2 units
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Joinery and carpentry installation work – Um- und Neubau Rathaus Grefrath - Bautischlerarbeiten
Gemeinde GrefrathGermanyJoinery and carpentry installation workJoinery workDeadline in 30 daysPublished on Nov 19, 2026
Germany – Parquet flooring – VE 70 - Parkettarbeiten Ebene 1-3, Komplettsanierung Rathaus Potsdam, 14469 Potsdam
Kommunaler Immobilien Service Potsdam (KIS) Eigenbetrieb der Landeshauptstadt PotsdamGermanyParquet flooringDeadline in 54 daysPublished on Nov 19, 2026
Germany – Landscaping work for green areas – Samtgemeinde Lüchow (Wendland) - Neubau Grundschule in Wustrow_Los 21 Freianlagen
Samtgemeinde Lüchow (Wendland)GermanyLandscaping work for green areasDeadline in 53 daysPublished on Nov 19, 2026
Germany – Electricity supply installations – Erweiterungsbau Seniorenpflegeheim "St. Stephanus" in Osterwieck Los 04 Netzersatzanlage
Diakonisches Werk im Kirchenkreis Halberstadt e.V.GermanyElectricity supply installationsEmergency generatorDeadline in 10 daysPublished on Nov 19, 2026