Skip to content
Back to search

Poland – Works for complete or part construction and civil engineering work – Zaprojektowanie, wybudowanie i uruchomienie Instalacji Termicznego Przekształcania Odpadów pochodzenia komunalnego z wysokosprawnym odzyskiem energii (ITPO) w Wysokiem Mazowieckiem

ZAKŁAD WODOCIĄGÓW, KANALIZACJI I ENERGETYKI CIEPLNEJ SP. Z O. O.PolandPublished on Nov 18, 2026
27 days left

Description

The subject of the contract is the design, construction, commissioning and handover for operation of the Thermal Waste Treatment Plant with high energy recovery (ITPO) in Wysokie Mazowieckie, the scope and purpose of which is described in detail in Annex 1 to SWZ – Description of the Subject of the Contract – Functional-User Programme. The contract will be executed on a "turnkey" basis (design and build). The subject of the contract includes, in particular, the execution of: 1) Design documentation, construction, technological, installation, along with obtaining decisions and agreements allowing for the comprehensive execution of construction works, 2) Delivery of necessary equipment and materials, 3) Preparatory works, 4) Construction works in the scope of buildings, structures, access roads, maneuvering areas, fire roads and connections with external objects as well as technological, sanitary, power supply, electrical, AKPiA, CCTV networks and installations, as well as fire-fighting installations, 5) Necessary demolitions, dismantling and removal of existing collisions, 6) Installation of equipment, technological, sanitary, power supply, electrical, AKPiA, IT, CCTV networks and installations, as well as fire-fighting installations, 7) Commissioning and carrying out start-up, test run and regulatory run, as well as warranty, 8) Obtaining all necessary decisions, certificates, permits, approvals and concessions in order to hand over the facility for use and handover for operation, 9) As-built documentation, operating instructions, job instructions, commissioning documentation, test and trial instructions, test run and regulatory run plan, 10) Training of the crew and maintenance based on previously prepared training materials, 11) Warranty obligations and provision of service during the warranty period as well as ensuring the supply of operating materials and spare parts, 12) Provision of technical assistance service during the first 12 months of operation.

CPV codes

Works for complete or part construction and civil engineering workArchitectural, construction, engineering and inspection servicesRefuse-incineration plant construction workConstruction works for power plants and heating plantsConstruction workMachinery and apparatus for filtering or purifying gasesIndustrial chimneysAssembly of metal structuresStructural worksPipelaying construction workHeat-exchange units, air-conditioning and refrigerating equipment, and filtering machineryElectrical installation workElectrical fitting workCommand and control systemSoftware package and information systemsArchitectural, engineering and planning servicesEngineering design servicesSite preparation and clearance workAssembly and erection of prefabricated structuresBuilding installation workElectrical wiring and fitting workElectrical wiring workAlarm system and antenna installation workLightning-protection worksWaste incineratorsLifting and handling equipmentArchitectural design servicesVentilation equipmentCommand and control system, printing, graphics, office automation and information-processing equipmentInstallation services of waste incineratorsInstallation services of special-purpose machinery and equipmentInstallation services of guidance and control systemsHeat-exchange unitsSales, marketing and business intelligence software package

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders