Skip to content
Back to search
This tender has been withdrawn.

Poland – Construction work – Budowa Specjalnego Ośrodka Szkolno-Wychowawczego w Sanoku – etap II

Powiat SanockiPolandPublished on Sep 22, 2026
Deadline passed

Description

**Subject of the contract: Implementation of the task entitled: Construction of the Special Educational and Care Centre in Sanok – Phase II. Overall scope of the investment: • Phase II of the investment comprehensively includes internal and external finishing works, installation works of all branches in the scope of internal and external installations, installation of glazed joinery, land development in accordance with the project, installation of photovoltaic systems, construction of a collector for draining rainwater to the San, and construction of an underground fire-fighting water tank. • Supply and installation of equipment for land development, sports fields, recreation areas, parking lots, school environment lighting, and external fencing. • Supply and, if necessary, installation of rehabilitation equipment, office and classroom equipment, gym equipment, and dormitory and canteen equipment. The scope and details of the supplies must be agreed in full with the Contracting Authority. • Installation of a photovoltaic system on the building's roof. • Construction of a containerised transformer station under the conditions specified by the electricity supplier. Currently, after Phase I of the investment, the facility is in the open rough state. The roofs are covered with compressed channel plates, secured with a single layer of thermal insulation, and equipped with temporary overflow drains. No insulation layer or so-called fall layer has been laid. The roof of the sports hall at this stage is covered with trapezoidal sheeting. The subfloors in all parts of the building have been closed with a layer of lean concrete. Under the floors, sections of sanitary drainage have been made in accordance with the design documentation, with their outlets led outside the building's footprint. As part of the works in Phase I of the investment, a collision with a 15 kV medium-voltage cable, included in the design documentation, has been removed. The conditions for the execution of the water supply connection will change. After the water supply connection was made by the Lublin Regional Infrastructure Office to the military facilities in the vicinity of the SOSW, the possibility of connecting to the water supply pipe laid on the county plot arose. The contractor is obliged to submit a detailed project of the interior arrangement, which should be submitted to the Contracting Authority for acceptance. 2. The subject of the contract must be realized, in particular, in accordance with the Technical Documentation (Annex No. 2 to the SWZ). The material scope of the task, which is the subject of the tender, is described in detail in the technical documentation, technical specification for the performance and acceptance of works, and the scope of works. Any catalogue items are provided solely to facilitate the preparation of the calculation – their use for valuation is not mandatory. The technical specification, scope of works, and documentation constitute an annex to this specification. The quality requirements of the elements constituting the subject of the contract are described in the technical documentation, in particular in the technical specification for the performance and acceptance of works. Since the remuneration of the contractor indicated in the offer will have a lump-sum nature, the contractor should base the valuation of the offer on the scope indicated in the technical documentation. The scope of works has an auxiliary nature. The occurrence during the implementation of the contract of works not included in the scope or of works in a greater quantity in relation to that accepted in the scope will not entitle the contractor to claim additional remuneration – if the necessity to perform these works resulted from the technical documentation. 3. The contractor will provide the Contracting Authority with a warranty and a guarantee for the building works carried out and the materials used for a period and on the conditions specified in Section XII of the SWZ (the warranty and guarantee period for defects is one of the criteria for evaluating offers). 4. Special conditions for securing the construction site and carrying out building works: the building works must be carried out in accordance with the technical conditions and safety rules applicable in construction, as well as agreements to the project, and the construction site must be secured against access by unauthorised persons. The contractor is also obliged and at their own cost to: - carry out all types of works by persons holding current construction authorisations, - secure the construction site and carry out works in accordance with the OHS and fire safety regulations; - prepare and hand over to the Contracting Authority the post-construction documentation, - secure the installations and equipment on the construction site and in its immediate vicinity against their destruction or damage during the performance of the works, which are the subject of this Agreement; - ensure safe use of the area adjacent to the construction site; - compile during the implementation of the works, which are the subject of this Agreement, all the documentation in accordance with the provisions of construction law, - remove all defects and faults identified during the works within the agreed time by the Parties, but not longer than the technically justified time necessary for their removal, - protect and manage the construction site until the completion of the implementation of the Investment, which does not exclude the Contracting Authority's entitlement to supervision, - eliminate the effects of the impact of the construction process on the construction environment, - pay fees for waste storage. - carry out the necessary tests and obtain opinions before commencing use.**

CPV codes

Construction workSite preparation workElectrical installation workElectrical engineering installation worksBuilding construction workPlumbing and sanitary worksConcrete workReinforced-concrete workMasonry and bricklaying workInsulation workFloor and wall covering workSpecial trade construction works other than roof worksPlastering workRoof works and other special trade construction worksJoinery and carpentry installation workWater plumbing workCentral-heating installation workBoiler installation workDrain-laying workAir-conditioning installation workVentilation installation workConstruction work for water and sewage pipelinesPipelaying construction workInstallation of cable infrastructure

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders