France – Construction work – Ilot F1 FARCY - Conception et réalisation pour des travaux de construction d’une résidence d’environ 45 logements seniors et 45 logements en Accession.
Description
F1 FARCY - Design and construction for the building of a residence of approximately 45 senior housing units and 45 social housing units. As part of the National Urban Renewal Programme, ALTER – developer of the Belle-Beille ZAC – is the owner of the former site of the UDAF, located at 4 Avenue Général Patton in ANGERS, and has carried out the demolition of this site. ALTER has allocated to ALh three sites intended to accommodate a dedicated offer of 130 "senior" housing units, including the F1 plot located on the former UDAF site, for 45 housing units, in addition to the plots on Tati and Rue Boisramé. These 45 housing units will be financed with 60 % PLAI and 40 % PLUS as part of the reconstruction of the demolished offer within the framework of the NPNRU. On this plot, it has been agreed to build 45 additional social housing units for sale, in place of the operation initially to be built on the site of 40 Notre Dame du Lac, demolished at the start of the NPNRU programme. Forecast timeline: Procurement procedure: from June 2026 to December 2026 Start of services: January 2027 Submission of building permit: 2nd quarter 2027 Start of works: 3rd quarter 2027 Duration of works: 18 months Delivery: 2029
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Wall-covering work – Accord-cadre à bons de commande pour des travaux d'entretien courant de Peinture Revêtements Muraux et Revêtements de sols
OPH de la Haute-SaôneFranceWall-covering workFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Installation of road lighting equipment – Travaux de Génie Electrique sur le territoire de Grand Besançon Métropole
Grand Besançon MétropoleFranceInstallation of road lighting equipmentInstallation of outdoor illumination equipmentDeadline in 33 daysPublished on Sep 08, 2026
France – Wall-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de peinture et revêtements muraux
OPH de la Haute-SaôneFranceWall-covering workDeadline in 44 daysPublished on Sep 08, 2026
France – Floor-covering work – Accord-cadre à bons de commande en multi-attribution pour des travaux d'entretien courant de revêtements de sols
OPH de la Haute-SaôneFranceFloor-covering workDeadline in 44 daysPublished on Sep 08, 2026