Skip to content
Back to search
This tender has expired.

Switzerland – Airport buildings construction work – VEB Verdrängungen B10 / B - BKP 281 Unterlagsböden / Fugenlose Bodenbeläge

Flughafen Zürich AGSwitzerlandPublished on Sep 15, 2026
Deadline passed

Description

Brief Description

At Zurich Airport, the central infrastructure is being modernized step by step. In the past 15 years, central areas have been extensively overhauled: Dock B was completely redesigned, Terminal 2 was fundamentally renovated and expanded, and a new security control center with direct access to the Airside Center was created between Terminals 1 and 2. Furthermore, the baggage sorting system north of Terminal 1 and the complete baggage sorting system were renewed. Next, the renewal of those infrastructure elements that have aged significantly is planned. Thus, Dock A, including the tower, dates back to 1985 and has remained structurally almost unchanged. In terms of functionality, environmental standards, and structural quality, it no longer meets current requirements. A comprehensive examination led to the decision to replace the current Dock A with a new building north of the existing building. The planned new Dock A, the future tower, and the completely renovated apron, together with further infrastructural adaptations, form the central construction projects for the next 15 to 20 years. The implementation will be carried out in stages – with the premise that the flight operation runs smoothly and the newly created facilities meet future operational requirements. Following the above-mentioned facts, the project VEB Verdrängung B10 / B (PA19AA572 VPK 25-06-007) deals with the new construction and expansion of the VIP / EDA-Lounge, which is currently located under the Airside Center at the root of Dock A. The new location is on the south side of Terminal 2 on floors 1 and 2 and offers VIP guests a direct connection to the special processes. A new staff access to the airside will also be created, replacing the staff access in the root of Dock A.

Brief Description of Tendered Work

Repair and supplementation of existing subfloors as well as creation of new subfloors and application of new epoxy floor coverings.

CPV codes

Airport buildings construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders