Poland – Construction work – Zwiększenie bezpieczeństwa i niezawodności odbioru i oczyszczania ścieków dla aglomeracji Ostrowca Świętokrzyskiego poprzez modernizację Miejskiej Oczyszczalni Ścieków w Ostrowcu Św. – Etap I
Description
The subject of this procedure is the implementation, in the "design and build" system, of the contract entitled: "Increasing the safety and reliability of sewage reception and treatment for the Ostrowiec Świętokrzyski agglomeration through the modernisation of the Municipal Wastewater Treatment Plant in Ostrowiec Świętokrzyski – Stage I". The investment includes the preparation of complete design documentation, obtaining the required decisions, agreements and permits, carrying out construction, technological, sanitary, road, electrical and HVAC works, supply and installation of equipment, integration of systems, commissioning and trial operation, staff training, as well as the preparation of as-built, operational, legal and settlement documentation. The scope of the contract includes, in particular, the modernisation of the coarse screen building, raw sewage pump stations I and II, dense screen building, horizontal sand traps, thickened sludge pump station, K2 transfer chamber, PIX dosing station, blowing station, pipe gallery, sludge thickening and dewatering station, lime silo, sludge deposit – Object 49, SN distribution building, administrative-social building, external lighting, distribution boards, power and control cabinets, digital communication network and SCADA and HVAC visualisation system. The contract also includes the construction of Object 50, i.e. a complete installation for transforming municipal sewage sludge into a soil improver, along with the technological building, sludge and lime transport and dosing equipment, hygienisation and agglomeration reactor, biofilter, electrical and control installations, access road, site preparation and removal of soil from the existing lagoon or mound. The contractor will be obliged to carry out, at their own cost, a complete research, technological, documentary and legal procedure, the result of which will be a final product that can be legally used as a soil improver, not having the status of waste and not classified as waste with code 19 08 05. As part of Object 49, the contractor will carry out a technical, structural, fire, environmental and operational assessment of the existing sludge deposit and its roofing. In case it is found that the existing object does not meet current requirements, the contractor, within the framework of the contractual remuneration, will carry out all necessary design and construction works, including repair, modernisation, reconstruction, strengthening, partial or complete demolition of existing elements and their reconstruction or the construction of a new object. The result of these works is to be the preservation or construction of a complete, roofed canopy or other equivalent object intended for the safe storage of sludge or the final product, meeting all applicable regulations, structural standards, fire safety requirements, occupational health and safety, environmental protection and operational requirements of the Purchaser. It is not permissible to complete the implementation of the contract without ensuring a functioning, roofed storage area for sludge or the final product. 3.2. The treatment plant is an operational facility and must maintain uninterrupted capacity to receive and treat sewage and manage sludge throughout the contract implementation period. The contractor is obliged to design, organise and carry out the works in a way that ensures the continuity of technological processes, including the application of necessary work phasing, technological bypasses, temporary pipelines, standby pumping stations, reserve power and control systems and agreed switchovers. Throughout the period of modernisation works, the treatment plant must meet all the requirements, conditions and parameters specified in the valid water permit, particularly in terms of the quantity and quality of treated sewage discharged. It is not permissible to reduce the quality of treated sewage, the capacity to receive sewage or to cause exceedances of the water permit parameters as a result of the contractor's actions or omissions. The contractor is responsible for the consequences of disruptions to the technological process caused by factors on their side. 3.3. The contractor is responsible for the completeness, compliance and mutual compatibility of all designed and executed solutions, achieving the required technological parameters, integrating equipment with the SCADA/HVAC system, carrying out the required tests, trials and measurements, commissioning mechanical, electrical, hydraulic, HVAC and technological systems and handing over to the Purchaser a complete set of documentation, licences, configurations, controller programs, security copies and instructions. The detailed scope and requirements are specified in the Functional User Program (FUP), which is a superior document to this description. However, the scope of the subject contract is a separate part of the attached FUP.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work – Zwiększenie bezpieczeństwa i niezawodności odbioru i oczyszczania ścieków dla aglomeracji Ostrowca Świętokrzyskiego poprzez modernizację Miejskiej Oczyszczalni Ścieków
Miejskie Wodociągi i Kanalizacja Sp. z o. o.PolandConstruction workEngineering design servicesDeadline in 28 daysPublished on Nov 22, 2026
Poland – Construction work – Budowa bloku S w ramach zadania: „Budowa i wyposażenie infrastruktury szpitalnej w Wojewódzkim Szpitalu Specjalistycznym im. Stefana Kardynała Wyszyńskiego SPZOZ w Lublinie na wypadek sytuacji kryzysowej lub konfliktu zbrojnego”
Wojewódzki Szpital Specjalistyczny im. Stefana Kardynała Wyszyńskiego Samodzielny Publiczny Zakład Opieki ZdrowotnejPolandConstruction workSite preparation and clearance workSurface work for streetsDeadline in 4 daysPublished on Nov 22, 2026
Poland – Construction work – Projekt i budowa Centrum Kultury (Miasteczka Kultury) w Ożarowie Mazowieckim na dz. nr ew. 6/214 przy ulicy Sochaczewskiej
Gmina Ożarów MazowieckiPolandConstruction workArchitectural design servicesArchitectural, construction, engineering and inspection servicesDeadline in 9 daysPublished on Nov 22, 2026
Poland – Construction works for power plants and heating plants – Budowa kotłów elektrodowych o mocy 300 MWt oraz akumulatora ciepła 52 tys. m3 netto wraz z infrastrukturą pomocniczą w PGE Energia Ciepła S.A. Oddział Wybrzeże w Gdańsku
PGE Energia Ciepła S.A.PolandConstruction works for power plants and heating plantsIndustrial machineryBoilersDeadline in 22 daysPublished on Nov 22, 2026