Czechia – Building installation work – ERDF KVALITA ZČU - ZČU v Plzni – „Rekonstrukce posluchárny UP 108“, Univerzitní 22, Plzeň (3.vyhlášení)
Description
The subject of the public contract is the implementation of construction works according to the PD, i.e. mainly construction and assembly works, demolition, dismantling and supply of materials necessary for the reconstruction of the lecture hall UP 108 and other affected spaces and rooms in the technical basement - basement. This includes, in particular, structural modifications related to greater seating comfort for students, a new ventilation and cooling concept. Heating modifications and the connection of district heating will be carried out. This is associated with the modification of the existing MaR (TRONIC) system with connection to the central control room. Furthermore, electrical distribution (high voltage, low voltage) will be modified. The subject of fulfillment also includes the equipment of the interior, modifications of walls and surfaces, incl. preparation for the assembly of AV technology end devices. Furthermore, the fulfillment will include, among other things, the dismantling of the existing district heating piping with the occurrence of asbestos in the sealing between the pipe fittings, incl. the ecological disposal of hazardous waste according to the relevant hygiene regulations.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Czechia – Construction work – Realizace protipovodňových opatření města Brna - Etapy IX,X,XI – výběr zhotovitele
statutární město BrnoCzechiaConstruction workCycle path construction workDyke construction workDeadline in 18 daysPublished on Nov 03, 2026
Czechia – Intercity railway works – Optimalizace a elektrizace trati České Velenice (mimo) – Veselí nad Lužnicí (mimo) – Infrastruktura
Správa železnic, státní organizaceCzechiaIntercity railway worksRailway bridge construction workConstruction work for tunnels, shafts and subwaysDeadline in 21 daysPublished on Nov 03, 2026
Czechia – Construction work – II/503 Nymburk, most ev.č.503-004 přes Labe II.
Krajská správa a údržba silnic Středočeského kraje, příspěvková organizaceCzechiaConstruction workDeadline in 9 daysPublished on Nov 03, 2026
Czechia – Reinforced-concrete structures – Stavební práce ke zřízení větrných elektráren
RenoEnergie, a.s.CzechiaReinforced-concrete structuresConstruction work for highways, roadsDeadline in 9 daysPublished on Nov 03, 2026