Poland – Architectural, construction, engineering and inspection services – Wykonanie aktualizacji dokumentacji projektowej głębokiej termomodernizacji budynków szkoły i warsztatów Zespołu Szkół Mechanicznych nr 2 w Bydgoszczy

Miasto BydgoszczPolandPublished on Nov 17, 2026
33 days left

Description

The subject of the contract is the implementation of an update to the design documentation for the deep energy renovation of the school and workshop buildings of Zespół Szkół Mechanicznych nr 2 in Bydgoszcz. The subject of the contract is described in the annex to the Contract Specification entitled Description of the Subject of the Contract with Annexes. 2. For interested Contractors, the Contracting Authority allows participation in a meeting to view the site of the planned investment: on 30.11.2026 at 14:00. The meeting will take place at the entrance to the building of Zespół Szkół Mechanicznych 2 at ul. Słoneczna 19 in Bydgoszcz. Participation in the meeting is not mandatory. 3. The Contracting Authority does not plan to award contracts as referred to in Article 214(1)(7) of the Public Procurement Law (uPzp). 4. The Contracting Authority requires the submission of a performance bond equivalent to 5% of the total price offered by the Contractor.

II. 1. CERTIFICATES. The personal evidentiary means indicated in Section X may be replaced by a valid certificate of public procurement contractors, as referred to in Article 124(2) of the Public Procurement Law, exclusively to the extent that the certificate confirms the absence of grounds for exclusion or the fulfilment of the conditions for participation in the procedure (if the conditions have been specified in the procedure) corresponding to the requirements specified in the SWZ. The certificate does not replace personal evidentiary means concerning grounds for exclusion not covered by the certification, in particular Article 108(1)(6) of the Public Procurement Law, Article 109(1)(6) of the Public Procurement Law, Article 7(1) of the Act of 13 April 2022 on special solutions to counter the support of aggression against Ukraine and serving to protect national security, as well as circumstances that have arisen in the course of this procedure. 2. The certificate replaces personal evidentiary means exclusively to the extent covered by a valid certification and indicated by the contractor in a statement, as referred to in Article 125(1) of the Public Procurement Law. If the certificate covers only part of the grounds for exclusion or part of the condition (if the conditions have been specified in the procedure) for participation in the procedure, or confirms the fulfilment of the condition at a lower level than required in the SWZ, the contractor submits personal evidentiary means in the remaining scope. 3. Within the scope resulting from a valid certificate, the Contracting Authority does not require from the contractor other personal evidentiary means, with the reservation of Article 124(4) of the Public Procurement Law and Article 31(6) of the Act on the Certification of Public Procurement Contractors. 4. In accordance with Article 126(1) of the Public Procurement Law, before selecting the most advantageous offer, the Contracting Authority will call upon the contractor whose offer has been highest scored to submit, within a specified period of no less than 10 days from the date of the call, current personal evidentiary means indicated in Section X, to the extent that they have not been replaced by a valid certificate of public procurement contractors, taking into account the following provisions: 1) If it follows from the preliminary statement, as referred to in Article 125(1) of the Public Procurement Law, that the contractor will use a certificate, and the contractor has provided data relating to the certificate enabling the Contracting Authority to independently verify the certificate in the certification database, the Contracting Authority will not call upon the contractor to submit personal evidentiary means to the extent that the circumstances required by the Contracting Authority result from that certificate, 2) If the certificate does not cover all the circumstances required by the Contracting Authority, the Contracting Authority will call upon the contractor to submit personal evidentiary means exclusively to the extent not covered by the certification 3) If the data provided by the contractor do not allow the certificate to be found or verified in the certification database, the Contracting Authority may call upon the contractor to submit, supplement, correct or explain those data in accordance with the provisions of Article 128(1) or (4) of the Public Procurement Law. If, despite the call, the Contracting Authority is unable to verify the certificate, the certificate will not be taken into account to the extent that it cannot be verified. 4) If the data necessary to assess the circumstances confirmed by the certificate have not been disclosed in the certificate or in the certification database due to their legally protected nature, the Contracting Authority may require the contractor to make those data available or to obtain the consent of the certifying entity to make them available to the Contracting Authority, on the basis of Article 31(6) of the Act on the Certification of Public Procurement Contractors. 5) In the event that the Contracting Authority obtains information indicating that the contractor has misled the certifying entity, which could have had a significant impact on the granting of the certification of public procurement contractors, or that the contractor has ceased to meet the conditions for granting that certification, (if the conditions have been specified in the procedure) the Contracting Authority, on the basis of Article 128a(1) of the Public Procurement Law, will call upon the contractor to provide explanations within a specified period of no less than 5 days from the date of the call. If the Contracting Authority considers the contractor's explanations to be insufficient, it will apply Article 128a(2) of the Public Procurement Law. 6) In the event of the suspension of the validity of the certification of public procurement contractors during the procedure, the Contracting Authority, on the basis of Article 128a(3) of the Public Procurement Law, will call upon the contractor to submit, within a specified period of no less than 5 days from the date of the call, personal evidentiary means to the extent that the submitted certificate was to confirm the absence of grounds for exclusion or the fulfilment of the conditions for participation in the procedure for the purposes of this procedure (if the conditions have been specified in the procedure). The provisions of Article 128(2)–(5) of the Public Procurement Law shall apply mutatis mutandis. 7) In the event of the loss of validity of the certificate in whole or in part during the procedure, the certificate will not be taken into account to the extent that it has lost its validity. In such a case, the Contracting Authority will call upon the contractor to submit the appropriate personal evidentiary means to the extent that the certificate was to confirm the absence of grounds for exclusion or the fulfilment of the conditions for participation in the procedure (if the conditions have been specified in the procedure).

CPV codes

Architectural, construction, engineering and inspection servicesArchitectural design servicesArchitectural, engineering and surveying servicesEngineering design servicesProject and design preparation, estimation of costs