Luxembourg – Medium-voltage installation work – Nouveau Centre Logistique de l’Infrastructure Ferroviaire à Bettembourg/Dudelange / Travaux d’installations de courant fort. Phase candidatures

Société Nationale des Chemins de Fer LuxembourgeoisLuxembourgPublished on May 25, 2026
No deadline given

Description

Works on the site of the New Logistics Centre of the Railway Infrastructure at Bettembourg/Dudelange, including:

• A 1,600 kVA medium-voltage transformer

• Medium-voltage cells

• Energy distribution via energy rails

• Low-voltage electrical panels

• LED luminaires

• A 458 kVA generator set

• 20 AC charging stations of 22 kW

• 1 400 kW ultra-fast charger

• An emergency lighting system with 2 centralised batteries