Poland – Construction work – „Zwiększenie bezpieczeństwa i niezawodności odbioru i oczyszczania ścieków dla aglomeracji Ostrowca Św. poprzez modernizację Miejskiej Oczyszczalni Ścieków w Ostrowcu Św. – Etap I”
Description
The subject of this procedure is the implementation, in the "design and build" system, of the contract entitled: "Increasing the safety and reliability of sewage collection and treatment for the Ostrowiec Świętokrzyski agglomeration through the modernisation of the Ostrowiec Świętokrzyski Municipal Wastewater Treatment Plant – Stage I". The investment includes the preparation of complete design documentation, obtaining the required decisions, agreements and permits, carrying out construction, technological, sanitary, road, electrical and AKPiA works, supply and installation of equipment, integration of systems, commissioning and test run, personnel training, as well as the preparation of post-construction, operational, legal and settlement documentation. The scope of the contract includes, in particular, the modernisation of the coarse screen building, the raw sewage pump stations I and II, the dense screen building, horizontal sand traps, thickened sludge pump station, K2 transfer chamber, PIX dosing station, blower station, pipe gallery, sludge thickening and dewatering station, lime silo, sludge deposit – Object 49, SN distribution building, administrative-social building, external lighting, distribution boards, power and control cabinets, digital communication network and SCADA and AKPiA visualisation system. The contract also includes the construction of Object 50, i.e. a complete installation for converting municipal sewage sludge into a soil improver, along with the technological building, sludge and lime transport and dosing equipment, hygienisation and agglomeration reactor, biofilter, electrical and control installations, access road, site preparation and removal of earth from the existing lagoon or mound. The contractor will be obliged to carry out, at their own expense, a complete research, technological, documentary and legal procedure, the result of which will be a final product that can be legally used as a soil improver, not having the status of waste and not classified as waste with code 19 08 05. As part of Object 49, the Contractor will carry out a technical, structural, fire, environmental and operational assessment of the existing sludge deposit and its roofing. In the event that the existing facility does not meet current requirements, the Contractor, within the framework of the contractual remuneration, will carry out all necessary design and construction works, including repair, modernisation, reconstruction, strengthening, partial or complete demolition of existing elements and their reconstruction or the construction of a new facility. The result of these works will be the preservation or construction of a complete, roofed canopy or other equivalent facility intended for the safe storage of sludge or the final product, meeting all applicable regulations, structural standards, fire safety, OHS, environmental protection and operational requirements of the Purchaser. It is not permissible to complete the implementation of the contract without ensuring a functioning, roofed storage area for sludge or the final product. The treatment plant is an active facility and must maintain uninterrupted capacity to receive and treat sewage and manage sludge throughout the contract implementation period. The contractor is obliged to design, organise and carry out the works in a manner that ensures the continuity of technological processes, including the application of necessary work phasing, technological bypasses, temporary pipelines, standby pumping stations, reserve power and control systems and agreed switchovers. Throughout the modernisation work, the treatment plant must meet all the requirements, conditions and parameters specified in the valid water permit, particularly in terms of the quantity and quality of the treated sewage discharged. It is not permissible to reduce the quality of the treated sewage, limit the capacity to receive sewage or cause exceedances of the water permit parameters as a result of the Contractor's actions or omissions. The contractor is responsible for the consequences of disruptions to the technological process arising from causes on their side. The contractor is responsible for the completeness, compliance and mutual compatibility of all designed and implemented solutions, achieving the required technological parameters, integrating equipment with the SCADA/AKPiA system, carrying out the required tests, trials and measurements, commissioning mechanical, electrical, hydraulic, AKPiA and technological systems and handing over to the Purchaser a complete set of documentation, licences, configurations, controller programs, security copies and instructions. The detailed scope and requirements are specified in the Functional User Program (PFU), which is a superior document to this description. However, the scope of the subject matter of the contract is a separate part of the attached PFU.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work – Realizacja projektu pod tytułem „Poprawa atrakcyjności turystycznej w Otulinie Roztocza - Etap I”
Gmina BychawaPolandConstruction workOutdoor sports equipmentDeadline in 7 daysPublished on Oct 07, 2026
Poland – Cycle path construction work – „Rowerowe Roztocze. Drogi pieszo – rowerowe w obszarach wiejskich. Rozbudowa dróg powiatowych nr 2737L, 2740L, 2739L w zakresie budowy dróg pieszo – rowerowych”
Powiat KraśnickiPolandCycle path construction workSite preparation workSite preparation and clearance workDeadline in 35 daysPublished on Oct 07, 2026
Poland – Construction work for water and sewage pipelines – Wykonanie zagospodarowania terenu przy Zespole Szkół im. Ks. Jerzego Popiełuszki w Juchnowcu Górnym.
Gmina Juchnowiec KościelnyPolandConstruction work for water and sewage pipelinesSewer construction workConstruction workDeadline in 36 daysPublished on Oct 07, 2026
Poland – Cycle path construction work – „Rowerowe Roztocze. Drogi pieszo – rowerowe w obszarach miejskich. Rozbudowa dróg powiatowych nr 2704L, 2757L, 2702L, 2748L w zakresie budowy dróg pieszo – rowerowych.”
Powiat KraśnickiPolandCycle path construction workSite preparation workSite preparation and clearance workDeadline in 35 daysPublished on Oct 07, 2026