Skip to content
Back to search

France – Engineering design services for mechanical and electrical installations for buildings – Accord-cadre mono-attributaire à bons de commande pour des prestations d'études Techniques Thermique et Fluides en milieu hospitalier et médico social pour des missions d'audits, d'expertise et de maîtrise d'oeuvre et d'assistance à maîtrise d'ouvrage

Centre Hospitalier Intercommunal de Toulon la Seyne sur MerFrancePublished on Oct 12, 2026
53 days left

Description

The framework agreement will be executed through the issuance of purchase orders. The details of the missions entrusted to the contractor are set out in the tender documents. The services are paid for by unit and lump-sum prices.

2.1.1. Scope & Nature

Single- award framework agreement with purchase orders entrusting the Bureau d'Études Techniques (BET) with the overall engineering of the GHT 83 (hospital, tertiary, and medico-social):

* Expertise & Engineering: Thermal, fluids (sanitary and medical), renewable energies, digital architectures (Smart Building, BOS, Hypervision, IoT), telecoms (mobility/DECT) and electronic security (PC Security).

* Purchasing AMO: Definition of needs, drafting of tender documents, analysis of offers (Supplies, Services, Works).

* Execution AMO: Operational, administrative, and financial follow-up of works and operation-maintenance contracts.

2.1.2. Stakes & Objectives

Optimisation and securing according to 6 strategic axes:

* Clinical Safety & Security: Microbiological prevention, securing of medical fluids, protection of sites and reliability of emergency calls.

* Climate Resilience: Deployment of cooling solutions against heatwaves, efficient air conditioning.

* Compliance & Cybersecurity: Regulatory compliance and protection of technical networks (OT) against cyber threats.

* Efficiency: Optimisation of installations, maintenance follow-up and management via Smart Building.

* Performance: Energy reduction (Tertiary Decrees/BACS), decarbonisation (BEGES), integration of renewable energy.

* Decision: Provision of reliable technical and financial choices to secure investments.

2.1.3. Mandatory Qualifications

The Contractor will provide recognised qualifications (such as OPQIBI) in thermal, medical fluids, AMO operation, carbon assessments, information system engineering (Smart Building) and security. It guarantees absolute mastery of the rules of the art, NF standards (health, air quality, open protocols), the Public Procurement Code and the safety constraints of ERP type U.

2.1.4. Description of Missions

The present framework agreement is structured around the following 17 missions, activatable through purchase orders:

* M1: Sanitary Audit, Metrology and Risk Analysis (ASR).

* M2: Technical Audit Fluids, HVAC, Electricity and Climate Resilience.

* M3: Feasibility Studies (APS/APD), sizing (HVAC, fluids, renewable energy), comparison and estimation.

* M4: Project Studies (PRO) and Drafting of Technical Documents for the Tender Documents.

* M5: Contract Award Assistance (ACT) - Drafting, analysis, RATO, negotiation.

* M6: Execution Follow-up (VISA/DET) - Site supervision and compliance of documents.

* M7: Assistance with Reception Operations (AOR), OPR, snagging, GPA.

* M8: Assistance with and control of maintenance contracts (HVAC, Fluids, Energy, Fire Safety SSI, Hypervision, Security).

* M9-CVC: AMO upstream maintenance contracts HVAC - Needs (TCO), drafting tender documents and specifications.

* M9-FLUIDS: AMO upstream maintenance contracts medical fluids and emergency - Needs, tender documents and safety.

* M10: ACT Services - Analysis of maintenance offers, detection OAB, negotiations and finalisation.

* M11: Global energy audit, decarbonisation master plan and prospective engineering of the hospital estate (Tertiary Decrees and BACS, building, HVAC, BMS, heat recovery and support to the property master plan).

* M12: Medical fluids audit, emergency sources and decommissioning plan for nitrous oxide (N2O).

* M13: BEGES support (scopes 1/2/3), decarbonisation trajectories and reporting.

* M14: Smart Building audit, hypervision/BOS master plan, OT cybersecurity, telephony/mobility (DECT).

* M15: Design (Tender Documents) Smart Building, BOS, synoptic diagrams and evolution of emergency calls.

* M16: Execution follow-up (DET), multi-flow acceptance and AOR for Smart Building infrastructures.

* M17: Design (Tender Documents), DET and acceptance of Electronic Security (video, access, intrusion, PC Security).

CPV codes

Engineering design services for mechanical and electrical installations for buildings

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders