Skip to content
Back to search
This tender has expired.

Switzerland – Electrical fitting work – Elektroinstallationen

Gemeindeverwaltung HorwSwitzerlandPublished on Aug 23, 2026
Deadline passed

Description

The planned new construction of the Allmend Primary School aims to create a future-proof, sustainable, and pedagogically functional infrastructure for primary school grades 1 to 6. The four-story building will be constructed using conventional timber construction on the school site and will replace the existing outdoor sports facility ("Roter Platz"). The geological and hydrogeological conditions on the site are considered challenging. In particular, two separate groundwater levels must be taken into account. The building site requires a pile foundation (concrete displacement bored piles), also for service lines and inspection shafts (timber piles). With regard to flood protection, the new building meets the HQ300 requirements. The building services are located on the ground floor and top floor (no basement) to avoid damage from flooding. The building's load-bearing structure is based on a solid timber frame made of Fi/Ta. This is supplemented by three massive service cores made of reinforced concrete. The spiral staircases between the service cores are also made of reinforced concrete. The facade consists of prefabricated timber frame external elements. The building will be certified according to SNBS 2.1 Construction (the target is Gold Certification). The energy supply is provided via a connection to the local district heating network SeeEnergy (winter heat, summer cooling water). All areas will be equipped with underfloor heating. All floor coverings are made of polished industrial concrete and serve as thermal storage and light free cooling with regard to summer overheating hours. The control is carried out via room thermostats via the specified setpoint. For power generation, a building-integrated photovoltaic system will be installed on the roof, which takes over the function of the roof covering. Brise-soleil construction made of metal along the east and west facades serve as sunshades and form the structural weather protection of the facade. In the area of building services, the installation of a mechanical ventilation system is only planned in the areas of the inner cores and the auditorium. The classrooms will receive fresh air via manual natural window ventilation. The building is fully accessible. For the planned school building with an overall height of approx. 19 m in hybrid construction, it is considered a building of medium height. The fire protection planning is carried out according to quality level QSS 2 of the BS directive of the VKF. The surrounding design is based on the design concept "Centre 1st + 2nd Stage" and contributes to the development of a uniform public space in the centre of Horw. The schoolyard will be designed as a traffic-free, publicly accessible space, taking into account the extra-curricular shared use. The school garden serves exclusively for school use and is designed to be child-friendly and close to nature. In the sense of climate adaptation and promotion of biodiversity.

CPV codes

Electrical fitting work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders