Skip to content
Back to search

Germany – Architectural, construction, engineering and inspection services – ST 26026 Planungsleistungen: „Umbau und Erweiterung der Michael-Ende-Schule, Aurinstraße 59-63, 41466 Neuss“ – Los 3: Planung der technischen Gebäudeausrüstung

Rhein-Kreis Neuss - Die Landrätin - Zentrales VergabemanagementGermanyPublished on Jul 22, 2026
No deadline given

Description

The Rhein-Kreis Neuss intends to renovate and expand the Michael-Ende-Schule in Neuss. A feasibility study is available. The Rhein-Kreis Neuss is seeking suitable contractors to take over the necessary architectural and engineering services. The required services will be tendered separately in the following lots: Lot 1: Building Design Lot 2: Structural Design Lot 3: Building Services Design Lot 4: Landscape Design The implementation of the measures will be accompanied by an external project controller. With this procedure, the services for Lot 3 are being tendered: Lot 3: Building Services Design The Michael-Ende-Schule is a special needs school focusing on language and currently serves as a learning centre for 195 students. The primary school consists of three sections, all of which will be affected by the implementation of the measures: a new building housing the open all-day school (OGS) and the canteen, an older school building with classrooms, and an administration wing. Starting in the 2025/26 school year, there will be a legal entitlement to a place in full-day care for primary school children. For the year 2029, a student population of 212 is projected, distributed across 17 classes. The construction project aims not only to provide sufficient classrooms but also to improve the currently cramped situation of the school administration. To this end, the existing administration building will be demolished and replaced with a new structure. The new building will adopt the existing structure of the circular walkway and expand it with adjoining rooms. The gross floor area is approximately 3,400 m². Starting in the 2026/27 school year, school operations will be relocated to another school building. The planning of the interim solution and the move will be handled by the client and is therefore not part of the contractor's scope of services. The entire project must be completed by 30 September 2029. In the course of the construction work, it may be necessary to create various construction phases. The planning and implementation of the measure must comply with the demanding funding requirements. To maintain eligibility for funding, detailed documentation must be provided. As part of the optimization of the classrooms and common areas, the existing building will be energetically renovated.

CPV codes

Architectural, construction, engineering and inspection servicesArchitectural, engineering and planning services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders