Luxembourg – Electrical fitting work – NOUVEAU CAMPUS A HEFFINGEN - Lot 7 Travaux d'installations électriques
Description
The start of the works is scheduled for 16.04.2027. The duration of the works is 408 working days. The start of the workshop drawing preparation is scheduled for 16.04.2027. The duration of the preparation of workshop and assembly drawings and prefabrication works is 37 working days. The start of the on-site assembly is scheduled for 10.06.2027. The duration of the on-site assembly is 229 working days. The start of the commissioning is scheduled for 24.05.2028. The duration of the commissioning works, acceptance, removal of reservations and preparation of As-Built drawings is 142 working days.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Luxembourg – Tiling work – 5551 - Wunne mat der Wooltz à Wiltz PAP Q5 - Gierwerei Lots 5.2, 5.5, 5.6 et 5.7 - Travaux de carrelage
Fonds du LogementLuxembourgTiling workWall-tiling workFloor-tiling workDeadline in 30 daysPublished on Nov 15, 2026
Luxembourg – Facade work – 3493_façade, réf. Aa13-1
Société Nationale des Habitations à Bon Marché S.A.LuxembourgFacade workDeadline in 31 daysPublished on Nov 15, 2026
Luxembourg – Floor-screed works – CAMPUS BUR - LOT 13 CHAPE
Administration communale de Rosport-MompachLuxembourgFloor-screed worksInsulation workDeadline in 27 daysPublished on Nov 15, 2026
Luxembourg – Construction work – Gare de Wasserbillig – Construction d’un bâtiment EAM - phase candidatures
Société Nationale des Chemins de Fer LuxembourgeoisLuxembourgConstruction workNo deadline givenPublished on Nov 12, 2026