Skip to content
Back to search

Poland – Construction, foundation and surface works for highways, roads – ,,Budowa nowego przebiegu drogi wojewódzkiej nr 721 na odcinku od drogi krajowej nr 7 do skrzyżowania z ulicą Mleczarską w Piasecznie, odcinek II - od węzła drogowego S7 do skrzyżowania z ulicą Mleczarską w Piasecznie” – nr postępowania 194/26

Mazowiecki Zarząd Dróg Wojewódzkich w WarszawiePolandPublished on Nov 05, 2026
28 days left

Description

The detailed description of the subject of the contract is in the Tender Documentation (Part IV SWZ), in the Subject of Works - available only for viewing (Part V SWZ) and in the Cost Estimate (in the scope of utilising destruct containing exceeded permissible limits of polycyclic aromatic hydrocarbons - Part VI SWZ). 2. The Contractor is obliged to ensure, at their own cost, safe conditions for road and pedestrian traffic in the area of the works covered by the contract, based on the "construction time" traffic organisation project, prepared by and at the cost of the Contractor. The Contractor is obliged to update the permanent traffic organisation project. 3. The project has been adapted to the needs of all users, including ensuring accessibility for disabled people. As a public object, it has no accessibility restrictions for all road users, which is required by the regulations in force at the time of preparing the project documentation regarding the technical requirements that roads should meet: Regulation of the Minister of Transport and Maritime Economy on the technical conditions that public roads and their location should meet (i.e. Journal of Laws of 2016, item 124, as amended). To ensure facilities for disabled and elderly people, the prepared documentation has provided for: lowering of kerbs separating the carriageway from the pavement at pedestrian crossings, the use of warning pavement slabs on pavements before pedestrian crossings and at bus bay platforms, and the implementation of road lighting. 4. In the event that the contract subject description refers to trademarks, patents or origin, source or a specific process that characterizes the product or services provided by a specific contractor, the Purchaser allows equivalent solutions. 5. In the event that the contract subject description refers to standards, European technical approvals, certificates, technical specifications and technical reference systems, the Purchaser allows equivalent solutions described. 6. The Purchaser envisages the awarding of contracts, as referred to in Article 214(1)(7) of the PZP Act, for a total net value of: 164,903,414.96 zł. As part of a similar contract, the following is envisaged to be carried out: - preparatory works, - surveying works - demolition works, - earthworks, - substructures, - pavements, - bridge works, - installation works, - land reclamation works - power works - telecommunications works - construction and building works - drainage works of the road body, - street elements, - traffic organisation and BRD works, - finishing works, - greenery works The aforementioned works relate to the section on which the construction works will be carried out and/or adjacent sections. 7. The Contractor is obliged to have a Civil Liability insurance policy for damages caused during the implementation of the contract for the subject of the contract and to third parties for the entire period of the contract's validity and for a guaranteed amount not lower than 75,000,000.00 zł. 8. Contract implementation deadline: 27 months from the date of signing the contract, including: - 24 months from the date of signing the contract – deadline for completion of works; - up to 27 months from the date of signing the contract - deadline for implementation of the contract subject. The Contractor is obliged to comply with the following set interim deadlines (milestones) for the completion of works and the sequence of their implementation: I Milestone – completion of works (confirmed by a partial acceptance protocol) with a value of not less than 25% of the gross remuneration for the completion of the entire contract subject (excluding remuneration for the utilisation together with the transport of asphalt destruct containing exceeded permissible limits of polycyclic aromatic hydrocarbons) within a deadline not later than 8 months from the date of signing the contract. II Milestone - completion of works (confirmed by a partial acceptance protocol) with a value of not less than 75% of the gross remuneration for the completion of the entire contract subject (excluding remuneration for the utilisation together with the transport of asphalt destruct containing exceeded permissible limits of polycyclic aromatic hydrocarbons) within a deadline not later than 18 months from the date of signing the contract. III Milestone - completion of 100% of works (confirmed by the Purchaser with a final acceptance protocol without significant defects) within a deadline not longer than the final acceptance deadline for works. No later than before the deadline of III Milestone the Contractor is obliged to present to the Purchaser documents confirming the utilisation in accordance with the applicable law of asphalt destruct containing exceeded permissible limits of polycyclic aromatic hydrocarbons. The Purchaser, in accordance with the contract conditions, allows for the possibility of changing the deadline for the implementation of interim deadlines. 9. The Contractor, whose offer was selected as the most advantageous, will provide security for the proper performance of the contract in the amount of 5% of the total price given in the offer. The Purchaser envisages the application of the so-called reverse procedure, as referred to in Article 139(1) of the PZP Act, i.e. the Purchaser will first carry out an examination and evaluation of offers, and then carry out a substantive qualification of the Contractor, whose offer was highest rated, in terms of lack of grounds for exclusion and meeting the conditions for participation in the procedure. In accordance with Article 257 of the PZP Act, the Purchaser envisages the possibility of invalidating the subject of the procedure if the public funds that the Purchaser intended to allocate for the financing of the whole or part of the contract have not been granted.

CPV codes

Construction, foundation and surface works for highways, roadsSite preparation workConstruction work for pipelines, communication and power linesConstruction work for bridges and tunnels, shafts and subwaysConstruction work for water and sewage pipelines

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders