Switzerland – Works for complete or part construction and civil engineering work – EPFL ASB – AO 62 – PRESTATIONS GLOBALES - Blindages actifs et passifs - CFC 289
Description
The Advanced Science Building (ASB) project of the EPFL aims to create a set of ultra-high technology laboratories meeting strict requirements in terms of vibrations, electromagnetic fields, thermal stability and hydrometric control. Located on the campus, at the site of the current parking lot on route J.-D. Colladon, it will accommodate installations that cannot be housed in existing buildings. For more information about the project, please consult the link below: https://www.epfl.ch/about/philanthropy/fr/soutien-aux-nouveaux-batiments/advanced-science-building/. The present tender aims to acquire turnkey services for the design, execution plans and implementation of passive and active shielding. Detailed elements will be presented in Phase II. The bidder will have a duty of performance and the concept, studies and implementation will be entirely their responsibility (CFC 289). For more information about the present contract, please consult the tender specifications and its annexes.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Switzerland – Non-metal joinery installation work – COLLEGE VOLTAIRE Bâtiment principal – rénovation au standard HPE Réno
Etat de Genève, Département du territoire - DT, Office des bâtimentsSwitzerlandNon-metal joinery installation workDeadline in 49 daysPublished on Nov 26, 2026
Switzerland – Construction work – KZN l 46024 l BKP 379-01 Bühneneinrichtungen
Hochbauamt, Baubereich BSwitzerlandConstruction workDeadline in 53 daysPublished on Nov 26, 2026
Switzerland – Non-metal joinery installation work – COLLEGE VOLTAIRE Bâtiment principal - rénovation au standard HPE Réno
Etat de Genève. Département du territoire - DT. Office cantonal des bâtimentsSwitzerlandNon-metal joinery installation workDeadline in 50 daysPublished on Nov 26, 2026
Switzerland – Construction work – BKP 113 Altlasten, Thun Polygon, Sanierung Gebäudehülle Haustechnik
armasuisse ImmobilierSwitzerlandConstruction workPollutants tracking and monitoring and rehabilitation servicesDeadline in 46 daysPublished on Nov 26, 2026