Skip to content
Back to search

France – Technical control services – Mission de maîtrise d’œuvre réseau pour la construction d’un réseau de chaleur et d’une centrale d’énergie sur la Technopole Futuroscope.

DALKIA (31)FrancePublished on May 28, 2026
No deadline given

Description

In the context of the implementation of a heat network supplying 33 substations, from a power plant consisting of 2 heat pumps drawing energy from a geothermal aquifer and 2 gas boilers as a backup/top-up, Dalkia is launching a consultation to design and implement the 5 km heat network (pre-insulated steel pipe class 2) and the 2.3 km geothermal network (PEHD pipe) connecting to 8 wells (4 extraction and 4 reinjection). The present consultation concerns only the lump-sum contract for the design and construction supervision of the buried networks (excluding the power plant, excluding the substation, excluding the wells). The mission includes the phases of Detailed Design (APD), Project Studies (PRO), Tendering of Contractors (DCE + ACT), Validation of Completed Works (VISA), Works Execution Management (DET-OPC) and Operations Prior to Acceptance of Works (OPR-AOR). The sizing elements mentioned above are provisional, the final elements will be indicated in the consultation documents phase offer.

CPV codes

Technical control servicesTechnical inspection services of engineering structuresConsultative engineering and construction services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders