France – Technical control services – Mission de maîtrise d’œuvre réseau pour la construction d’un réseau de chaleur et d’une centrale d’énergie sur la Technopole Futuroscope.
Description
In the context of the implementation of a heat network supplying 33 substations, from a power plant consisting of 2 heat pumps drawing energy from a geothermal aquifer and 2 gas boilers as a backup/top-up, Dalkia is launching a consultation to design and implement the 5 km heat network (pre-insulated steel pipe class 2) and the 2.3 km geothermal network (PEHD pipe) connecting to 8 wells (4 extraction and 4 reinjection). The present consultation concerns only the lump-sum contract for the design and construction supervision of the buried networks (excluding the power plant, excluding the substation, excluding the wells). The mission includes the phases of Detailed Design (APD), Project Studies (PRO), Tendering of Contractors (DCE + ACT), Validation of Completed Works (VISA), Works Execution Management (DET-OPC) and Operations Prior to Acceptance of Works (OPR-AOR). The sizing elements mentioned above are provisional, the final elements will be indicated in the consultation documents phase offer.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Technical testing, analysis and consultancy services – Essais et mesures pour le contrôle qualité des matériaux utilisés dans la construction et l’entretien des infrastructures de Nîmes Métropole
Nîmes Métropole (30)FranceTechnical testing, analysis and consultancy servicesDeadline in 33 daysPublished on Oct 20, 2026
France – Analysis services – MISSIONS DE SUIVI DE LA QUALITÉ DE L'EAU ET DE FAUCARDAGE DES DIFFÉRENTS PLANS D'EAU DU PAARC DES RIVES DE L'AA ET DE LA COLME
COMMUNE DE GRAVELINESFranceAnalysis servicesAgricultural, forestry, horticultural, aquacultural and apicultural servicesDeadline in 33 daysPublished on Oct 20, 2026
France – Engineering services – Mission de maîtrise d'oeuvre relative aux travaux de restructuration des réseaux d'eau potable du SIVU du Haut--Ornain et du SIAEP d'Echenay.
SIVU du Haut OrnainFranceEngineering servicesDeadline in 58 daysPublished on Oct 20, 2026
France – Engineering studies – Schéma directeur pour l'alimentation en eau potable pour la Communauté de Communes de Cluses Arve et Montagnes
Commune de CLUSESFranceEngineering studiesDeadline in 33 daysPublished on Oct 20, 2026