Germany – Ventilation installation work – Lüftung 2A
Description
6 Channel and duct fans 300 - 4,100 m³/h
9 Air handling units - 3,200 - 15,500 m³/h
Approximately 4,400 m² of ventilation ducts and fittings
Approximately 1,750 m of spiral lock seam pipe DN 80 - 250
Approximately 35 m² of ventilation duct dismantling
Approximately 110 m of air duct dismantling DN 80 - 250
80 Square fire dampers; 120 Round fire dampers DN 100 - 250; 50 Fire dampers DN 100
195 Constant volume flow regulators/Throttle dampers; 295 Variable volume flow regulators
275 Ceiling air diffusers; 80 Butterfly valves DN 100 - 200; 20 Pipe and duct grilles
16 Dust diffusers; 8 Exhaust air boxes OP
60 Louvered silencers; 345 Pipe silencers DN 100 - 200
2 Stainless steel intake and exhaust towers; 2 Louvered hoods
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Electrical installation work – OMS1 Neubau Bürogebäude Eingang Schnarrenberg, Elektroinstallationsarbeiten
Universitätsklinikum TübingenGermanyElectrical installation workElectrical wiring workElectrical fitting workDeadline in 30 daysPublished on Sep 14, 2026
Germany – Construction work for buildings relating to health – Neubau GESAMTKLINIKUM Heidekreis in Bad Fallingbostel - Tischlerarbeiten
Heidekreis-Klinikum gGmbHGermanyConstruction work for buildings relating to healthInstallation of built-in furnitureNon-metal joinery installation workDeadline in 36 daysPublished on Sep 14, 2026
Germany – Excavating and earthmoving work – Gewässerwiederherstellung Ahr BNA230 Walporzheim: BA04 Abtransport und Verwertung von Bodenaushub
Kreisverwaltung Ahrweiler - Stabsstelle Hochwasserresilienz und AufbaukoordinationGermanyExcavating and earthmoving workSoilSubsoilDeadline in 13 daysPublished on Sep 14, 2026
Germany – Installation of doors and windows and related components – Neubau Sporthalle (SPH) Fenster- und Fassadenarbeiten
Stadt SalzgitterGermanyInstallation of doors and windows and related componentsBlindsSun protection devicesDeadline in 34 daysPublished on Sep 14, 2026