Skip to content
Back to search

Germany – Architectural, construction, engineering and inspection services – Planungsleistungen Bauphysik für: Umstrukturierung und Modernisierung des bbz Arnsberg (Kopie)

Handwerkskammer SüdwestfalenGermanyPublished on Aug 03, 2026
No deadline given

Description

The Chamber of Crafts South Westphalia intends to carry out a restructuring and modernisation of the bbz Arnsberg. The bbz Arnsberg offers a comprehensive training programme in various forms for the vocations of motor vehicles, electrical, metal, plumbing and heating, wood, construction/finishing, hairdressing, and business administration, primarily for inter-company training and master preparation. The buildings are mostly in the structural condition of the year of their construction. Due to their age, most of the buildings no longer meet the current technical and energy standards. Modernisation is necessary. In addition to the new construction of a technical centre with approximately 4,000 square meters of gross floor area, the project includes the replacement new construction of building G and the modernisation of the existing areas. The project is to be implemented in various packages of measures according to the prioritisation of the measures, i.e. in sections. -------------------------------------------------------------------------------------------------------------------------------------- The planning should be carried out comprehensively in advance to ensure a smooth process. Furthermore, the funding application documents (Z-Bau) must be submitted jointly for all measures upon completion of the performance phase 3. The fundamental approval capability must be clarified in advance. The implementation of all measures will take place during ongoing operations. Further eligible measures (e.g. demolition, parking spaces, etc.) are part of the contract according to the respective scope of services. It is expected that the entire planning will be carried out in 3D models, among other things, to achieve higher accuracy in quantity determination and collision detection. The use of BIM is not planned. The requirements of the GEG must be met for new construction and modernisation. -------------------------------------------------------------------------------------------------------------------------------------- The total costs (cost groups 200 - 500 and 700) for these measures incl. demolition, were estimated at approximately 45.7 million EUR gross (BKI status 2023). This sum is considered to be generally eligible for funding and is to be updated within the framework of the further investigations. -------------------------------------------------------------------------------------------------------------------------------------- The overall measure is to be financed through funding and a share of own funds. The funding consists of federal funds, state funds and GRW funds. The common goal is to submit the funding documents in 2027. For this purpose, it is necessary that the services of the contractor required for the grant application are available by April 2027. It is assumed that the last structural measures will be commissioned by December 2036. This will be followed by the demolition of the existing buildings used as interim structures and subsequently the final completion and commissioning of the outdoor facilities. -------------------------------------------------------------------------------------------------------------------------------------- The implementation of the construction project must be carried out with due regard to economy and thrift. The guidelines for federal grant construction projects, in particular the technical supplementary provisions (ZBau), must be observed. The construction project is a grant project funded by the federal government and the state.

CPV codes

Architectural, construction, engineering and inspection services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders