Skip to content
Back to search
This tender has been withdrawn.

Poland – Water meters – „Wdrożenie systemu monitorowania sieci wodociągowej w ramach realizacji projektu pn.: Zwiększenie efektywności dostaw wody na terenie Gminy Chynów.”

GMINA CHYNÓWPolandPublished on Sep 08, 2026
Deadline passed

Description

The subject of the order is the introduction of comprehensive monitoring of the water supply network in order to detect leaks and minimize water losses. A system for monitoring water flow in the network will be installed, the task of which will be to indicate the actual water flows (water meters with remote water reading along with a program enabling network modelling). A detailed description and the manner of implementation of the order is contained in the Subject of the Order Description (hereinafter: OPZ) – constituting Annex 1 to the SWZ.

CPV codes

Water meters

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders