France – Structural shell work – TRAVAUX DE DEMOLITION, DEPLOMBAGE ET GROS OEUVRE DU 6EME ETAGE DES LOCAUX DE LA CEB
Description
LOT 2 Technical: Clearing-Lead Removal-Asbestos Removal-Demolition: The general clearing of the premises of all equipment, networks and fittings, All preliminary lead removal and asbestos removal work, The demolition of partitions and certain wall surfaces, The demolition of a significant area of the attic floor, The demolition of floors. The formation of sufficient lead removal teams to accompany Lot 3 during its structural reinforcement operations. Read article 1.2 of Lot 3 and take into account the phasing of its lead work.
LOT 3 Technical: Structural Reinforcement - Heavy Construction - Masonry: The implementation of the sizing studies of the works to be carried out and of the temporary supports, The implementation of the demolition of load-bearing walls, The implementation of the demolition to create the stairwell, The implementation of the reinforcement under the attic floor, The implementation of the reinforcements at the openings of the load-bearing walls, The installation of the temporary supports during the provisional phases, Reinforcement and/or repair of lintels at the load-bearing walls, The implementation of concrete beams and masses, Implementation of metal lintels at the light wells to be created.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
France – Rain-water basin construction work – A46S – Travaux de réhabilitation des bassins 434-1 / 434-2 et 619-1
AUTOROUTES DU SUD DE LA FRANCE (ASF)FranceRain-water basin construction workDeadline in 45 daysPublished on Nov 02, 2026
France – Solar panel roof-covering work – Contrat de concession de travaux pour le financement, la conception, la réalisation, l'exploitation et la maintenance de centrales solaires photovoltaïques en toiture de trois immeubles de la RIVP, en vue d'opérations d'autoconsommation d'électricité
Régie Immobilière de la Ville de ParisFranceSolar panel roof-covering workNo deadline givenPublished on Nov 02, 2026
France – Building construction work – Réhabilitation de la MAS des Alouettes - 4, rue Maurice Renard 51000 Châlons-en-Champagne - Relance suite infructuosité
NOV'HABITATFranceBuilding construction workWaterproofing workSmiths' waresDeadline in 30 daysPublished on Nov 02, 2026
France – Structural shell work – TRAVAUX R+1C CIRCUIT D'URGENCE BLOC OBSTETRIQUE
CENTRE HOSPITALIER D'AUCHFranceStructural shell workPaints and wallcoveringsPlumbing and sanitary worksDeadline in 27 daysPublished on Nov 02, 2026