Skip to content
Back to search
This tender has been withdrawn.

Poland – Sewerage work – Budowa sieci kanalizacji sanitarnej w miejscowości Grzechynia (Etap IV)

Przedsiębiorstwo Wodno-Kanalizacyjne "Eko-Skawa" Sp. z o.o.PolandPublished on Oct 04, 2026
Deadline passed

Description

The subject of the contract is the execution of construction works consisting of the construction of a gravity-push sanitary sewer network (excluding sections Ø160 mm), two sewage pumping stations (network PG1 and PG2) and accompanying electrical and road infrastructure, in the localities of Grzechynia (Maków Podhalański municipality), as part of the protection of the Skawa River catchment area above the Świnna Poręba reservoir. 2. The scope of the contract includes the section from the connection point to the existing sanitary collector in Maków Podhalański, through the crossing under the Skawa River to ul. Za Wodą, and then through the entire locality of Grzechynia upwards, to the Nowakówka settlement. i.e.: 1) construction of the remaining part of the gravity-pressure sanitary sewer network to be completed, with a total length of approx. 20 km. The gravity sewers will be made of bell-and-spigot concrete pipes (on sections implemented by the open-cut method) and jacking concrete pipes (on sections implemented by the trenchless method – microtunneling/jacking), as well as PE100 plastic pipes on sections with smaller diameters and on guided boreholes and PVC pipes fi 160 on distribution network sections. 2) inspection chambers with diameters Ø1000 mm and Ø600 mm (precast concrete elements) and Ø425 mm PVC. 3) Before the pumping station PG1, in order to ensure canal retention, a section with an increased pipe diameter to Ø1400 mm made of polymer concrete together with 3 wells Ø2500 mm. 4) On the pressure pipes, expansion wells Ø1200 mm and cleaning-ventilation wells and wells with isolating valves Ø1500 mm. 3. The scope of the works includes in particular: demolition works of existing surfaces, earthworks (excavations, excavation wall reinforcements, backfills, backfills with compaction), dewatering of excavations for the duration of the construction (including drainage and connection wells), network installation works, execution of guided boreholes and jacking together with protective pipes, tightness tests, as well as the full reconstruction of road surfaces and green areas disturbed by the works.

CPV codes

Sewerage workSite preparation and clearance workSewer construction workConstruction work for water and sewage pipelinesSewage pumping stations construction workConstruction work for electricity power linesSurface work for roadsInstallation of outdoor illumination equipmentConstruction work for pipelines, communication and power lines

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders