Germany – Metalworking – Metallbau Außen/ Kunststofffenster
Description
The advertised works include all metal construction works in the external area in the existing structure and for the new construction, incl. necessary demolition works in connection with changed openings and the necessary replacement of elements in connection with acoustic and fire protection requirements in Hall 2. The work and protective scaffolding required for the metal construction works outside the building will be provided by the client, unless these are separately mentioned in the item. Areas for the temporary erection of the site installation and for use as an interim storage area for waste material are available according to the site installation plan. Water, power and wastewater connections will be provided through the separate award of the Central Site Installation. The following main services are to be carried out:
· Demolition work of window and door systems due to changed openings and fire protection requirements.
· New construction of plastic windows in the 2nd and 3rd floor incl. light wells and sun protection
· Plastic windows for the upgrading of historically remaining steel windows
· New construction of light well roofs
· Aluminium-glass window and door systems in the existing facade
· Overhaul of remaining aluminium windows and door systems as well as non-historical steel windows
· PR facades
· Steel doors and gates
· Industrial folding gates
To accelerate the construction measure, a two-shift operation is to be assumed.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Lift installation work – Lutherhaus 24 - Tragkonstruktion u. Verglasung Aufzugsanlage Erschließungsgebäude_L05.3
Stiftung Luthergedenkstätten in Sachsen-AnhaltGermanyLift installation workDeadline in 30 daysPublished on Nov 03, 2026
Germany – Construction work – Rohrleitungsbau, Gebäudeautomation- Erneuerung der 24 Systemzentralen der zentralen Klimaanlage
Universitätsklinikum Aachen AöRGermanyConstruction workHVAC packagesDeadline in 33 daysPublished on Nov 03, 2026
Germany – Multi-dwelling buildings construction work – 44 Heizung, 45 Sanitaer-Lueftung, 46 Elektro,
Grundstücks-Gesellschaft TRAVE mbHGermanyMulti-dwelling buildings construction workDeadline in 34 daysPublished on Nov 03, 2026
Germany – Switching station installation work – Hochschule der Sächs. Polizei (FH) Rothenburg - BA 03 Trainingszentrum
Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und VertragsmanagementGermanySwitching station installation workDeadline in 33 daysPublished on Nov 03, 2026