Skip to content
Back to search

Belgium – Energy meters – Raamovereenkomst plaatsen energiemeters - omsluiten data - energiemonitoring

stad KortrijkBelgiumPublished on Mar 29, 2026
No deadline given

Description

The City of Kortrijk wishes to equip around 30 buildings with energy meters. These include various building types, such as care homes, sports centres, administrative buildings, depots and neighbourhood and meeting centres. These sites have almost permanent occupancy and therefore require reliable, continuous monitoring. All meters to be installed must comply with EPC-NR and BACS requirements, so that both accurate monitoring and asset-level control are possible. In some buildings, energy consumption is billed on; for this, the meters must also enable digital and reliable consumption recording. The main contractor must be responsible for the following within this contract: 1. Concluding an acceptance contract for the installation of energy meters (electricity, water, gas and heat). 2. Maintaining these meters via a maintenance and service contract. The contractor is responsible for the correct transfer of measurement data to the database and the visualisation programme. If errors occur or a meter/logger or edge device fails, the contractor must resolve this or, if necessary, replace it so that data loss is minimised. 3. Setting up a monitoring platform.

CPV codes

Energy metersMetersSoftware package and information systems

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders