Skip to content
Back to search

Germany – Engineering services – Erweiterung und Sanierung Carl-Orff-Grund- und Mittelschule Dießen am Ammersee - Tragwerksplanung, Leistungsphasen 1-6 gemäß §§ 49 ff. HOAI

Markt Dießen am AmmerseeGermanyPublished on Jun 14, 2026
No deadline given

Description

The municipality of Dießen am Ammersee plans to expand and renovate the Carl-Orff primary and secondary school in Dießen am Ammersee. The reason for the planned measure is the currently insufficient space for full-day care in the primary school sector. The additional space requirement is to be covered by an extension new build (House F). At the same time, the renewal of the heating centre is to take place. Within the framework of a preliminary concept, variants for the extension were examined, which led to a preferred variant. For functional and economic reasons, an extension new build between the existing buildings E and B is therefore aimed at. With this extension and the conversion of the attic of House A with 1,380 m² of usable area, a very economical extension solution is available. In addition to the additional space requirement, the building stock (especially House E) also shows a considerable need for renovation and modernisation. This is particularly the case in the area of technical systems, with regard to fire protection, room acoustics and lighting. As the total investment volume/cost framework for the expansion, conversion and renovation measures, approximately 19.3 million € gross (cost groups 200-700, DIN 276) was determined within the framework of the preliminary concept. The milestones for the implementation of the project currently provide for: - Planning/performance start: mid-October 2026, - Construction start 1st phase = extension new build House F, conversion attic House A: spring 2028, - Completion 1st phase = extension new build House F and conversion attic House A: start of school year 2029/30 (= mid-September 2029), - Construction start 2nd phase = renovation and extension House E: summer holidays 2029 (= August 2029), - Completion 2nd phase = renovation and extension House E: end of 2030. Whether the renewal of the heating centre is to be advanced structurally or implemented within the framework of the 1st construction phase has not yet been finally determined and depends on the planning concept still to be developed in this regard. It is intended to award the following services (step-by-step) with this invitation to tender: Structural design, performance phases 1 to 6 according to §§ 49 ff. HOAI.

CPV codes

Engineering servicesLoad-bearing structure design services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders