Skip to content
Back to search
This tender has been withdrawn.

Poland – Surface work for roads – Budowa obwodnicy miejscowości Miedzna Drewniana w ciągu drogi wojewódzkiej Nr 726 w systemie „zaprojektuj i wybuduj”

Województwo Łódzkie - Zarząd Dróg Wojewódzkich w ŁodziPolandPublished on Jul 16, 2026
Deadline passed

Description

The subject of the contract is the preparation of design documentation along with obtaining a decision on the permit for the implementation of a road investment and construction works, namely: Construction works:  construction of a bypass in a new route of the provincial road No. 726 along with the expansion of the existing road on the initial and final sections of the investment  construction and expansion of intersections  demolition and construction of engineering structures, including a bridge structure over the Wąglanka River  construction of pedestrian paths  construction of a cycle path, pedestrian and cycle path  construction of bus bays  construction of exits  construction of road drainage  construction of a technological canal  construction and reconstruction of road lighting  reconstruction of infrastructure not related to the road  felling and planting of trees and shrubs. Design documentation:  map for design purposes  maps with the project of land division intended for the investment  geotechnical documentation  dendrological inventory  green management project  water law permit  construction project (including technical project)  executive project  project of permanent and temporary traffic organization  scope of works in accordance with STWiORB  technical specification for the performance and acceptance of construction works  information on safety and health protection  preparation of post-construction and geodetic inventory documentation with mapping and annotation  as part of the completed geodetic post-construction inventory, preparation of the necessary documentation to make changes in the land and building register in the scope of land use in accordance with the applicable regulations  report on the reassessment of the impact on the environment  performance of author's supervision during the implementation of construction works. As part of the design works, the Contractor will obtain all the necessary agreements, decisions and opinions to obtain a valid decision on the permit for the implementation of the road investment, in particular:  water law permit  decision on the agreement of the conditions for the implementation of the undertaking after conducting an assessment of the impact of the undertaking on the environment on the basis of the prepared Functional and Utilitarian Task Program named "Construction of the bypass of the village of Miedzna Drewniana on the provincial road No. 726 in the design and build system" with regard to the guidelines of the Contracting Authority regarding the solutions adopted in the above-mentioned document. 2. When implementing the task covered by this contract, means to ensure accessibility to persons with special needs, as referred to in the Act of 19 July 2019 on ensuring accessibility to persons with special needs, shall be applied. 3. Pursuant to the regulations of art. 121 of the Pzp, the Contracting Authority reserves the obligation of personal performance of key tasks related to: the execution of bituminous layers of the pavement structure (base layer, binder and wearing layer). This requirement does not apply to the production and transport of mineral-bituminous mixture. With regard to key tasks reserved for personal performance by the Contractor, the Contractor may not refer to the capabilities of the entity providing resources, on the basis of the principles specified in art. 118.1 of the Pzp, in order to demonstrate the fulfilment of the relevant participation conditions in the procedure. 4. The Contracting Authority envisages granting, within 3 years from the date of awarding the main contract, to the current contractor of services or construction works, a contract consisting in the repetition of similar services or construction works, in accordance with the subject of the main contract, up to the amount of 6 497 023,87 zł net. 5. The Contracting Authority does not allow the possibility of submitting partial offers. 6. The Contracting Authority recommends that the Contractor conduct a local vision.

CPV codes

Surface work for roadsDismantling worksSite preparation and clearance workFoundation work for roadsInstallation of road signsRoad-surface painting workInstallation of safety equipmentLandscaping work for green areasConstruction work for bridgesEngineering design services for the construction of civil engineering works

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders