Austria – Engineering services – (ProVia-ID 142628) Golling-Abtenau - Sulzau; Linienverbesserung Bereich Pass Lueg (Phase 2), Planung; Geologie und Hydrogeologie Tunnel; Einreichplanung & Optional Ausschreibungs- & Ausführungsplanung
Description
ÖBB-Infrastruktur AG intends to construct a line improvement with two single-track driving tubes in two tunnel sections (Ofenauer and Hiefler Tunnel) in the Pass Lueg area between the municipality of Golling an der Salzach and Stegenwald in the municipality of Werfen on the Salzburg-Wörgl route, section Bestands-km 31.0 to Bestands-km 37.0. The tender procedure in question includes all geological/geotechnical and hydrogeological planning and consulting services for the field of subsoil for the two new sections of the Ofenauer and Hiefler tunnels, with the exception of the open sections.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Austria – Architectural, construction, engineering and inspection services – A4 Anschlussstelle Flughafen West - Koordination Raum und Umwelt
Autobahnen- und Schnellstraßen-Finanzierungs-AktiengesellschaftAustriaArchitectural, construction, engineering and inspection servicesDeadline in 42 daysPublished on Nov 01, 2026
Austria – Bridge-design services – A13 Brenner Autobahn SiUm Ast IBK Süd km 2,3-3,3 - Kunstbautenplanung Ausschreibungs- und Ausführungsplanung
Autobahnen- und Schnellstraßen-Finanzierungs-AktiengesellschaftAustriaBridge-design servicesArchitectural, construction, engineering and inspection servicesEngineering design servicesDeadline in 10 daysPublished on Nov 01, 2026
Austria – Construction supervision services – S3 SAB Göllersdorf - Großstelzendorf - Leistungen der Örtlichen Bauaufsicht
Autobahnen- und Schnellstraßen-Finanzierungs-AktiengesellschaftAustriaConstruction supervision servicesDeadline in 28 daysPublished on Nov 01, 2026
Austria – Expert witness services – BAI0.PEN303.04 Gänserndorf (a) - Staatsgrenze n. Bernhardsthal; Streckenausbau (Phase 3); Bau - G31180 Nordbahn/Nord - Prüfung gem. §34b EisbG (HA + Option)
ÖBB-Infrastruktur AGAustriaExpert witness servicesNo deadline givenPublished on Nov 01, 2026