Germany – Construction work – Stadt Garbsen - Kita "An den Eichen" - Generalunternehmervergabe
Description
In the town of Garbsen - Berenbostel, a new key-ready daycare centre for 2 crèche and 3 kindergarten groups, including equipment, is to be built on a newly developed plot north of the residential area "An den Eichen". On a plot of approximately 3,200m², a two-storey building with approx. 665m² gross floor area and approx. 1,330m² gross floor area and a flat roof is planned. The two-storey building construction consists of a reinforced concrete base plate on strip foundations and reinforced concrete ceilings, massive outer walls with core insulation and facing brickwork as well as larger proportions of post-and-beam facades. Balconies and two external staircases as steel structures serve as escape and rescue routes and as access to the outdoor area. The windows and post-and-beam facade are to be designed as aluminium constructions with 2-pane insulating glazing. In some areas, roller shutter systems are planned as external sun protection. The flat roof is to be extensively landscaped with biodiversity modules in combination with a PV system. The building services include, in addition to the sanitary and electrical installation and the building automation, inter alia, a heating system as a heat pump system with buffer storage and underfloor heating as well as ventilation systems with several devices. The equipment includes, inter alia, a kitchen for a "cook-and-chill" process with additional cooking option, a tea kitchen, changing tables and straight up. The construction measure also includes the new creation of the outdoor area for crèche children (approx. 440m²) and kindergarten children (approx. 1,265m²), other areas (approx. 445m²) and a car park area for 11 cars (approx. 400m²) adjacent to the south. The outdoor area is to include varied, age-appropriate and natural play areas for both the crèche area (0-3 years) and the kindergarten area (3-6 years), with different play functions and in various levels of difficulty and variants. The implementation of the outdoor area includes, inter alia, various equipment elements such as cart shelter, waste housing etc. as well as the enclosure, lighting, ground modelling, paving areas and planting of the vegetation areas with perennials, grasses, shrubs and woody plants, which are suitable for crèche and kindergarten.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Germany – Metalworking – VE 3130 Schlosserarbeiten inkl. Fahrradständer
HafenCity Hamburg GmbHGermanyMetalworkingOffice block construction workDeadline in 30 daysPublished on Nov 26, 2026
Germany – Overhaul and refurbishment work – Knappschaft Kliniken Universitätsklinikum Bochum - Sanierung Bettenhochhaus - Betoninstandsetzung Fassade Haus A
Knappschaft Kliniken Universitätsklinikum Bochum GmbHGermanyOverhaul and refurbishment workScaffolding workConcrete workNo deadline givenPublished on Nov 26, 2026
Germany – Catenary's construction works – 2. Bauabschnitt Wilhelmshöher Allee Teil 1 - Austausch Betonfahrleitungsmasten
Kasseler Verkehrs Gesellschaft AG , , Das Vergabeverfahren erfolgt durch die Vergabestelle der , Städtische Werke Netz + Service GmbH, , Eisenacher Str. 12, , 34123 KasselGermanyCatenary's construction worksDeadline in 20 daysPublished on Nov 26, 2026
Germany – Sanitary fixture installation work – Neubau Verwaltungsgebäude 09.26a - VE 04.01 Sanitär
Kreis Recklinghausen, Der LandratGermanySanitary fixture installation workPlumbing and drain-laying workPlumbing and sanitary worksDeadline in 41 daysPublished on Nov 26, 2026